SECTION 22 ON0
<br />COMMON PLUMBING REQUIREMENTS
<br />PART GENERAL
<br />101 SUMMARY
<br />A. WORKSHALL CONSIST OF FURNISHING ALL LABOR AND MATERIALS NECESSARY FOR THE INSTALLATION OF
<br />B. ALL PUUREQUIRED BY THE
<br />AUTHORITIES HAVING JURISOI�TION. THE INTERNATIONAL PLUMBING CODE, THE INTERNATIONAL FUEL GAS
<br />CODE, THE INTERNATIONAL MECHANICAL CODE, THE INTERNATIONAL FIRE CODE, APPLICABLE PUBLICATIONS OF
<br />THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA SUCH AS NFPA 54 (THE NATIONAL FUEL GAS CODE). AND
<br />APPROPI-EASHRAESTANUARDS.
<br />C. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE GENERAL CONDITIONS, SUPPLEMENTAL
<br />GENERAL CONDITIONS OF THE PROJECT SPECIFICATIONS, ALL CONTRACT DOCUMENTS, AND MY BASE
<br />BUILDING SPECIFICATIONS AND BUILDING CRITERIA INCLUDED IN THIS PROJECT.
<br />D. D INGS ARE DIAGRAMMATIC IN NATURE, TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS,
<br />CERTIFIED EQUIPMENT DRAWINGS. AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK.
<br />E. THE DRAWINGS INDICATE THE LOCATION, TYPE AND SIZES OF VARIOUS UTILITIES WITHIN THE SITE WHERE
<br />KNOWN. ANY RELOCATION OR REMODELING REQUIRED MUST BE APPROVED BY THE ARCHfTECT BEFORE
<br />PREEDIINVESTIG ALL UTILITIES SUCH AS GAS AND WATER AND MAKEARRANGEME- WITH THE
<br />PROP
<br />ERAUTHORITY TO PAY FOR ANY CHARGES ASSOCIATED WITH CONNECTING THOSE UTILITIES.
<br />F. GOOD WORKMANSHIP AND APPEARANCE ARE CONSIDERED EQUAL TO PROPER OPERATION.
<br />G. PROVIDE ALL GORE DRILLING, CHANNELING, CUTTING, PATCHING, TRENCHING AND BACKFILL AS REQUIRED FOR
<br />INSTALLATION OF MECHANICAL EQUIPMENT, HOLES SHALL BE FILLED WITH CONCRETE PATCH. SEAL HOLES
<br />WITH FIREPROOFING ANOOR WATER PROOFING WHERE NECESSARY AND REFINISH ALL REPAIR WORK TO
<br />RE STORAGE OF ALL MATERIALS.
<br />I. OBTAIN AND ARRANGE FOR ALL PERMITS AND APPROVALS REQUIRED FORTHE EXECUTION OF THE WORK AND
<br />PAY ALL ASSOCIATED FEES.
<br />J. ALLEQUIPMENT AND PRODUCTS TO BE THOROUGHLY CLEANED AT THE COMPLETION OF THE WORK WITH ALL
<br />STICKERS. MARKING AND THE LIKE SHALL BE REMOVED. REMOVEALL RUBBISH, DEBRIS. SCRAPS ANDTHE LIKE
<br />FROM THE JOB SITE.
<br />t.ez wAJ>3uNTY
<br />ING CONTRACTOR
<br />SHALL
<br />DE TO THE
<br />A-ETHE PTUANBCE) WARRANTY OF ALL PLUMBING EOIPMENTVAND SYSTEEMIS ) YEAR ROVIDED NDR(FROM THE DTHISCONTRAACT,
<br />ALL DEFECTIVE EQUIPMENT OR MATERIALS WHICH APPEAR DURING THE WARRANTY PERIOD SHALL BE
<br />REPLACED OR REPAIRED BY THE CONTRACTOR IN ATIMELY FASHION.
<br />PART
<br />PRODUCTS
<br />201 GENERAL
<br />A. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND ACCESSORIES NECESSARY WHETHER SPECIFICALLY
<br />REQUIRED PLUMBING SYSTEMS COMPLETE AND OPERATIONAL.
<br />L EQUIPMENT PROVIDE' 'HALL
<br />BE NEW EXCEPT AS OTHERWISE STATED ON THE DRAWINGS. ALL EQUIPMENT
<br />PROVIDED SHALL BE ACCEPTABLE FOR INSTALLATION BYTHE AUTHORITY HAVING JURISDICTION.
<br />C. THE EQUIPMENT SCHEDULES ON THE DRAW INGS AND THROUGHOUT THESE SPECIFICATIONS PROVIDE
<br />MANUFACTURER AND MODEL INFORMATION. THIS SERVES AS THE STANDARD OF QUALITY FOR EQUIPMENT BY
<br />DIFFERENTMANUFACTURERS. THE SPECIFICATION ALLOWS FOR DIFFERENT MANUFACTURERS TO BE USED
<br />FOR THE EQUIPMENT. HOWEVER, REFER TO THE ARCHITECTURAL SPECIFICATIONS FOR SUBSTIMIONE BY
<br />MINUFACTUOTHER THAN THOSE HE SPECIFICATIONS. WHERE NO EQUIPMENT SPECIFICATION
<br />IS PROVIDED, THE SCHEDULED EQUIPMENT MANUFACTURER SHALL SERVE AS THE BASIS OF DESIGN AND PNY
<br />SUBSTITUTIONS SHALL MEET THE QUALITY STANDARD SET BY THE BASIS OF DESIGN.
<br />D. CONTRACTOR TO BE RESPONSIBLE FOR ANY CHANGES AND COSTS TOACCOMMODKM ANY EQUIPMENT
<br />EXCEPTTHE MANUFACTURER LISTED IN THE EQUIPMENT SCHEDULES, DRAWING NOTES ANDIOR CALLED OUT
<br />WITHIN THE SPECIFICATIONS. IF NO SCHEDULESARE INCLUDED ON THE DRAWING THAN THE FIRST NAMED IN
<br />THE CIFICATION IS THE STANDARD OF DESIGN.
<br />2A2 IDENTIFICATION
<br />A. PROVIDE PIPE AND EQUIPMENT IDENTIFICATION IN ACCORDANCE WITH ANSI A13.1 AND OR THE BUILDING
<br />STANDARDS,
<br />203 MISCELLANEOUS SPECIALTIES
<br />A. SLEEVES AND SLEEVE SEALS:
<br />1. WHERE PIPING PASSES THROUGH NEW MASONRY OR CONCRETE WALLS OR CONCRETE FLOORS,PROVIDE
<br />PIPE SLEEVES SLEEVESSHALL BE CONSTRUCTED OUT ED STEEL, CAST IRON -RASET
<br />SLEEVES IN FORMS PRIOR TO CONCRETE PLACEMENT. SLEEVES IN FLOORS SHALL EXTEND 2' ABOVE THE
<br />FINISHED FLOOR ELEVATION. WHERE LOCATED IN EXTERIOR WALLS, PROVIDE WATER STOPIN SLEEVE.
<br />2. PIPING WHICH PASSES THROUGH A RATED WALL SHALL BE PROVIDED WITH A UL DETAIL SUITABLE FOR PIPE
<br />MATERIAL AND SIZE. SLEEVE SHALL ONLY BE REQUIRED IF THE UL DETAIL REQUIRES THE SLEEVE. WHERE
<br />SLEEVES ARE REQUIRED AS NOTED ABOVE, PROVIDE A UL DETAIL THAT UTILIZES A SLEEVE.
<br />PROVIDES. ESCUT= PIPE PASSES THROUGH A
<br />A CHROME PLATED ESCUTCHEON.
<br />1 O ESCUTCHEON SHALL BENSTRUCTED INTONE PIECE SHED WALL,
<br />C. ACCESS ODORS
<br />1. WHERE D WITH PROVIDE OR TYPE AND SIZE VI E IRE ESSRAT DODORSR TO WHLY ERE
<br />CESSINSTALLED
<br />THELED ITEM THAT RATE
<br />LOATO WITH THE WALL OR CAVITY. PROVIDE FIRE RATED DOORS WHERE INSTALLED IN FIRE RATED
<br />ASSBLIES.
<br />BOLA OBTAIN AND ARRANGE FOR ALL PERMITS AND APPROVALS REQUIRED FOR THE EXECUTION OF THE WORK AND
<br />Y ALL ASSOCIATED FEES.
<br />B. PROVIDE ALL CORE DRILLING. CHANNELING, CUTTING, PATCHING. TRENCHING AND BACKFILL AS REQUIRED FOR
<br />INSTALLATION OF PLUMBING EQUIPMENT AND OR MECHANICAL EQUIPMENT, HOLES SHALL BE FILLED WITH
<br />CONCRETE PATCH. SEAL HOLES, FIREPROOFING WHERE NECESSARY, AND REFINISH ALL REPAIR WORK TO
<br />ORIGINAL CONDITION WHERE DAMAGED BY MECHANICAL WORK.
<br />ALL EQUIPMENT AND PRODUCT' TO BE THOROUGHLY CLEANED AT THE COMPLETION OF THE WORK WITH ALL
<br />C STICKERS, MARKINGS, AND THE LIKE REMOVED. REMOVEALL RUBBISH, DEBRIS, SCRAPS AND THE LIKE FROM
<br />THE JOB SITE,
<br />302 FLUSHINGANDCLEANING
<br />A. BEFORE FINAL CONNECTIONS ARE MADE IN THE PIPING SYSTEMS, SYSTEMS SHALL SE BLOWN OUT WITH AIR
<br />AND THEN COMPLETELY WASHED OUT WITH CLEANING COMPOUNDS COMPATIBLE WITH FINAL FLUID TOAVOID
<br />HE COMPLETE REMOVAL OF ALL FOREIGN
<br />MATERIALS.TFURNISH ALL TEMPORARY CONNECTIONSPVALVES, ETC., REQUIRED FOR THIS PURPOSE.
<br />B. AFTER FLUSHING, STERILIZE THE DOMESTIC WATER SYSTEM IN ACCORDANCE WITH AW WA STANDARD Cl-
<br />(CURRENT EDITION). DISINFECTING WATER MAINS. AND ALL SUBSEQUENT ADDENDA. AFTER MINIMUM CONTACT
<br />PERIOD, FLUSH THE SYSTEM WITH CLEAN WATER UNTIL THE RESIDUAL CHLORINE IS NO GREATER THAN THE
<br />CITY WATER. SUBMITTO THE ARCHTECT WRITTEN CERTIFICATION THAT STERILIZATION HAS BEEN PERFORMED
<br />NANCEMANUALS. PROVIDEATESTANALYSISBYTHESTATE
<br />HEALTH
<br />DEPARTMENT
<br />OF A RANDOM WATER
<br />ISgMPLE, IF REQUESTED BYTHE ARCHITECT.
<br />END OF SECTION
<br />SECTION 22 0716
<br />PLUMBING INSULATION
<br />PART1 GENERAL
<br />1.01 SUMMARY
<br />A. SECTION INCLUDES INSULATION FOR PLUMBING PIPING.
<br />2PART
<br />Z PROW 0T ON
<br />INSULATION SHALL BE PROVIDED ON ALL PRESSURIZED PLUMBING LINES, COOLING COIL CONDENSATE DRAIN
<br />LINES.
<br />2.02 PROTECTIVE SHIELDING GUARDS
<br />A. DESCRIPTION: MANUFACTURED PLASTIC WRAPS FOR COVERING PLUMBING FIXTURE HOT -AND COLD -WATER
<br />SUPPLIES AND TRAP AND DRAIN PIPING. COMPLY WITH AMERICANS WITH DISABILITIES ACT (AOA) AND ANSI
<br />A11].1 REQUIREMENTS. TRUEBRO OR EQUIVALENT.
<br />FIELD. PVCACKETE H GH- MPACT-RESISTAUV-RESISTANT PVC COMPLYING WITH ASTM D 1784, CLASS 16354-C;
<br />A NT, THICKNESS AE SCHEDULED; ROLL STOCK REPDV FOR SHOP OR FIELD CUTTING AND FORMING. THICKNESS IS
<br />INDICATED IN FIELDAPPLIED JACKET SCHEDULES.
<br />PARTS EXECUTION
<br />301 GENERAL INSTALLATION
<br />A. PIPING INSULATION SCHEDULE: SEE SCHEDULE ON DRAWINGS FOR INSULATION REQUIREMENTS.
<br />B. PROTECTIVESHIELDINGGUARDS: INETALLPROTECTVE SHIELDING GUARDS ON ALL LAVATORIESAND
<br />RES AS REQUIRED TO COMPLY W TTH THE REQUIREMENTS OF AMERICANS WITH DISABIUTIES
<br />ACT (qM) AND ANSI A11 ].1.
<br />C. FIELD -APPLIED JACKETS;
<br />1. ALLFITTINGS SHALL BE PROVIDED WITH PVC JACKETS.
<br />2. PROVIDE PVC AS AND WHERE NOTED.
<br />302 ON STIC COLD WATER PIPE, VALVES AND FITTINGS:
<br />A. INSULATE WITH U.L. APPROVED, FLAME RESISTANT, WHITE VAPOR BARRIER JACKETED, GLASS FIBER SNAP -ON
<br />LVESAND FITTINGS W ITH G-. FIBER BLANKET
<br />RS (COVERS TOTBE U.L. 25/50 RATED). WHERE THE USE OF PVC COVERS
<br />IN PLENUMS, ETCP IS RESTRICTED BY VARIOUS CODES VAVES AND FITTINGS SHALL BE INSULATED BY
<br />WRAPPING WITH BLANKET INSULATION. COVER THE _NFTO SAME DEPTH AS THE PIPE INSULATION WITH
<br />INSULATING CEMENT, ODETROWELED SMOOTH. IT IS THE CONTRACTOR'S AND MANUFACTURER'S RESPONSIBILITY
<br />TO IMCERTAIN THE HOE AUH4 BTJ- WILL AQ FTA)EANY PRODUCT TO BE INSTALLED ON THE PROJECT.
<br />uESHALLBE0.24 BN-INMRSp FTNEGREEs.
<br />C 1. INSULATION OF PIPES UNDER HANDICAPPED LAVATORIES: INSULATE ANGLE STOP ASSEMBLIES AND DRAIN
<br />LINES WITH FOAM INSERT COVERED WITH 1A" MINIMUM ABRASIVE RESISTANT EXTERIOR COVER WITH
<br />FASTENERS LOCATED OUT OF SIGHT. BROCAR TRAP WRAP KIT WOR AND BXHS. OR EQUIVALENT.
<br />END OF SECTION
<br />SECTION 221116
<br />DOMESTIC WATER PIPING AND SPECIALTIES
<br />TTALS
<br />1 mA. SUBMITTAL REQUIREMENTS SHALL BE AS IDENTIFIED IN SPECIFICATION SECTION 220010 COMMON PLUMBING
<br />REQUIREMENTS.
<br />1.02 CLAUTYASSURANCE
<br />A. POTABLE -WATER PIPING AND COMPONENTS SHALL COMPLY WITH NSF 14 AND NSF 61. PLASTIC PIPING
<br />COMPONENTS SHALL BE MARKED WITH'NSF-PW.'
<br />e. ALL FITTINGS SHALL BE LEAQ FR E ((ASTM LISTED)) D SHALL BE MADE W ITH COROSION-RESISTANT
<br />MATERIALSREQUEST THIRD PARTY CERTIFICATION TESTED IN
<br />ACCORDANCE WITH EN ISO
<br />65ID9 REGARDING DEZINCIFICATION CORROSION RESISTANCE AND STRESS
<br />CORROSION CRACKING.
<br />PART2 PRODUCTS
<br />2.01 PIPING AND JOINT MATERIALS
<br />A. HARD COPPER TUBE: ASTM B 88, TYPE L WATER TUBE, DRAWN TEMPER
<br />2.Oz VALVESAND OMESTICWATERSPECIALTIES
<br />A. ALVES-BRONZE: TWO.PIECE,FULL-PORT, BRONZE BALL VALVES WITH BRONZE TRIMLY LBE
<br />M To
<br />WTH
<br />DY
<br />R B- BRONZE
<br />CHROME -PLATED BRASS BAIL ALL COMPONENTS SHALL BE "DEZINCeFICATION RESISTANT AND CERTIFIED
<br />'LEAD-FREE:
<br />B. TEMPERATURE -ACTUATED WATER MIXING VAVES: MIXING VALVES ARE A BASIS-CF-DESIGN PRODUCT;
<br />SUBJECTTO COMPLIANCEWITH REQUIREMENTS, PROVIDE PROUCTINDICATED ON DRAWINGS. VALVESSHALL
<br />BE MADE OF BRONZE AND PRESSURE RATED FOR 125 PSIG. VALVES SHALL BE RATED TO ASSE 1017 FOR
<br />hKERICOFFEE MACHINE OR WASHING MACHINE OUTLET BOXES ARE A BASIS-OF-OESIGN
<br />C PROM CT;SUBJECTTOCOMPLWNCEWITHREWIREME,PROVIDEPRODUCTINDICATEDONDRAWINGS.
<br />BOXES AND FACE PLATE SHALL BE PLAB hC AND FIRE -RATED IF INSTALLED IN A RATED ASSEMBLY. PROVIDE
<br />WITH NTEGRAL BALL VALVES AND WATER HAMMER ARRESTORS. ALL OMONENTS SHALL BE CERTIFIED
<br />'LEAD-FREE:
<br />D. TRAPSEALPRIMERVALVES: TRAP -SEAL PRIMER VALVES ARE A BASIS -OF -DESIGN PRODUCT; SUBJECT TO
<br />e LIITH REQUIREMENTS, PROVIDE ROUCT INDICATED ON DRAWINGS. TRAPSEAL VALVES SHALL
<br />STED BRONZESHALL. BE CERTIFIED 'LEAD-FREE' BE ASS TYPE. ALL COMPONENTS SHA
<br />E. FLEXIBLEICONNECTORS; STAINLESS -STEEL -HOSE FLEXIBLE CONNECTORS: CORRUGATEOSTAINLESE-STEEL
<br />TUBING WITH STAINLESSSTEEL WIRE -BRAID COVERING AND ENDS WELDED TO INNER TUBING. ALL
<br />COMPONENTS SHALL BE CERTIFIED'LEAD-FREE'. WORKING -PRESSURE RATING: MINIMUM 200 PSIG. END
<br />CONNECTIONSNPS2 DSMALLER: THREADEDSTEEL-PIPE NIPPLE. END CONNECTIONS NPS 2-1M AND
<br />IFURGER.
<br />ED STEEL NIPPLE.
<br />F TRIC FITTINGS: ASSEMBLY OF COPPERALLOYAND FERROUS MATERIALS WITH SEPARATING
<br />NO NCONDUCTIVEINSULATINGMATERIAL. INCLUDE END CONNECTIONS COMPATIBLE WITH PIPES TO BE JOINED.
<br />DIELECTRIC NIPPLES AND COUPLINGS COMPLYING WITH IPPMO PS 66. ELECTROPLATED STEEL NIPPLE
<br />COMPLYING WITH ASTM F 154E PRESSURE RATING AND TEMPERATURE: BIDS PSIG AT 225 DEC F. LINING SHALL
<br />BE INERT AND NONCORROSIVE.PROPYLENE.
<br />3ARTON 3 EXECUTI
<br />.01 PIPINGSCHEDULE
<br />A. ABOVEGROUND
<br />PER TUBE, -M B N, TYPE L, WROUGHT -COPPER SOLDER.JOINT FITTINGS AND BRAZED
<br />DCAS OPPERTUBE,TMB88,TYPEL;COPPERPR WURESFAL-JOINFITTINGS;AND
<br />b PRESSURESEALED JOINTS.
<br />c. HARD OPPERTJBE, ASTM B88, TYPE L;EXTRUDED-E CONNECTIONS AND BRAZED JOINTS.
<br />B. FLANGEEANDUNIONS: FLANGES AND UNIONS MAYBE USED FOR AOVEGROUND PIPING JOINTS UNLESS
<br />OTHERWISE INDICKTIED.
<br />SPECIAL FITTINGS: TRANSITION AND SPECIAL FITTINGS WITH PRESSURE RATINGS AT LEAST
<br />C EQUAL
<br />ITO PIPING RATING MAV BE USED UNLESS OTHERWISE INDICATED.
<br />3.02 VALVESCHEDULE
<br />A. WHERE SPECIFIC VALVE TYPES ARE NOT INDICATED, THE FOLLOWING REQUIREMENTSAPPLY:
<br />1, SHUTOFFDUTWANDTHROTTINGDUTY: USE SALL VALVES FORPIPINGNPS 2AND SMALLER. USE
<br />BUTTERFLY OR BALL VALVES WITH FLANGED ENDS FOR PIPING NPS 2-112 AND LARGER.
<br />CIRCULATION PIPING, BALANCING DUTY: CICUITSOLVER
<br />1. MAN DUTY
<br />RAN V'IE'
<br />4. CHECK DUTY: HUSEBRONZE CHECK VALVES FOR PIPING NP92ANDEMALLER. USE IRON CHECK VALVES FOR
<br />NPS 2-112 AND LARGER.
<br />B. USE CHECK VALVES TO MAINTAIN CORRECT DIRECTION OF DOMESTIC WATER FLOW TO AND FROM EQUIPMENT
<br />C. IRON GROOVED -END VALVES MAYBE USED WITH GROOVED -END PIPING.
<br />END OF SECTION
<br />PART GENERAL
<br />NNCLUDES PIPING MATERIALS FOR SANITARY SEW ERAND VENT SYSTEMS As WELL As SPECIALTIES
<br />A ASSOCIATED WITH THE SANITARY SEWER SYSTEM.
<br />T2 PARPRODUCTS
<br />2.01 PI PING MATERIALS
<br />A. HUBLESS. CAST IRON SOIL PIPE AND FITTINGS. COMPLY WITH ASTM AtIN OR CISPI 3N.
<br />1. CISPI,HUBLESS-PIPING COUPLINGS: COMPLY WITH ASTM C I2)] AND CISPI 310. PRODUCTS SHALL BE
<br />STANLESBSTEEL CORRUGATED SHIELD WITH STAINLESS -STEEL BANDS AND TIGHTENING DEVICES; AND
<br />ASTM C
<br />B. COPPER TCBEAND RUBBER
<br />SLEEVE WITH INTEGRAL, CENTER PIPE STOP
<br />ITT
<br />1. H BE: ASTIM B SS TYPE L, WATER TUBE, DRAWN TEMPER. COPPER PRESSURE FITTINGS:
<br />COPPER FITTINGS'. ASME B16.18. CAST -COPPER -ALLOY OR ASME B16.22. WROUGHT -COPPER SOLDER OINT
<br />FITTINGS FURNISHWROUGHT-OPPERFFRINGBEINDICATED.
<br />2. SOLDER'. ASTM B 32, LEAD FREE WITH ASTM B 813, WATER-FLUSHABLE FLUX.
<br />C. PVC PIPE: ASTM D2665 ORASTM D3034.
<br />2. JOINTSSSOLVENT WELDED, WITH ASTM D2564 SOLVENT CEMENT.
<br />3. ACCEPTABLEFOREELOAGRADEUSEONLY.
<br />PARTS EXECUTION
<br />3.01 PIPING INSTALLATION
<br />A. DRAWING PLANS. SCHEMATICS. AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING
<br />SYSTEMS. INDICATED LOCATIONS AND ARRANGEMENTS WERE USED TO SIZE PIPE AND CALCULATE FRICTION
<br />LOSS, EXPANSION, PUMP BE NG, AND OTHER DESIGN CONSIDERATIONS, INSTALL PIPING AS INDICATED UNLESS
<br />DEVIATIONS TO IAYOUTARE APPROVED ON COORDINATION DRAWINGS.
<br />B. INSTALL PIPING IN CONCEALED LOCATIONS UNLESS OTHERWISE INDICATED AND EXCEPT IN EQUIPMENT ROOMS
<br />AND SERVICE AREAS.
<br />C. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT
<br />ANGLES OR PARALLELTO BUILDING WALLS. DIACONAL RUNS ARE PROHIBITED UNLESS SPECIFICALLY
<br />D, INND==ACCESSIBUE TUGS TO ALLOW SUFFICIENT SPACE FOR CEILING PANEL REMOVAL
<br />PIPING AT
<br />AINSTALL SOIL AND WASTE DRAINAGE
<br />F. AND VENT PIPING AT THE FOLLOWING MINIMUM SLOPES UNLESS
<br />OTHERWISE INDICATED:
<br />1, SANITTARYDRAIN: 2PERCENT (lhl INCH PER FOOT) DOWNWARD IN DIRECTION OF FLOW FOR PIPING NPS3
<br />AND SMALLER;1 PERCENT (1)8INCH PER FOOT) DOWNWARD IN DIRECTION OF FLOW FOR PIPING NPS 4 AND
<br />G. 1 PERCENT (Il8INCH PER FOOT) DOWN TOWARD VERTICAL FIXTURE VENT OR TOWARD VENT
<br />2 IPIN
<br />STACK.
<br />G. INSTALL CAST-IRON SOIL PIPING ACCORDING TO CISPI'S'CAST IRON SOIL PIPE AND FITTINGS HANDBOOK;
<br />CHAPTER IV, "INSTALLATION OF CAST IRON SOIL PIPE AND FITTINGS.-
<br />H. HANGER ROD AND SPACING AS REOUIRED BYTHE IPC FORTHE SIZE OF PIPE BEING INSTALLED,
<br />I. TEST SANITARY DRAINAGE AND VENT PIPING ACCORDING TO PROCEDURES OF AUTHORITIES HAVING
<br />JURISDICTION END OF SECTION
<br />SECTION
<br />DOMESTICWATER HEATERS
<br />PART1 GENERAL
<br />101 SUBMITTALS
<br />A. SUBMITTAL REQUIREMENTS SHALL BE AS IDENTIFIED IN SPECIFICATION SECTION 220010 COMMON PLUMBING
<br />RBOUIREMENTS.
<br />1.02 OUAUTYASSURANCE
<br />A. ELECTRICAL COMPONENTS, DEVICES, AND ACCESSORIES: LISTED AND LABELED AS DEFINED IN INFRA 70, BVA
<br />QUALIFIED TESTING AGENCY, AND MARKED FOR INTENDED LOCATION AND APPLICATION.
<br />B.ASHRAEIIESNACOMPLIANCE: AFFUCABLEREQUIREMENTSINASHRAEOESNA90.1.
<br />C. ASME COMPLIANCE: WHERE ASME-CODE CONSTRUCTION IS INDICATED, FABRICATE AND LABEL COMMERCIAL
<br />DOMESTIGWATER HEATER STORAGE TANKS TO COMPLY WITH ASME OILERAND PRESSURE VESSEL CODE:
<br />SECTION Vlll, DIVISION 1,
<br />D. NSFCOMPUANCE FABRICATE AND LABEL EQUIPMENT COMPONENTS THAT WILL BE IN CONTACT WITH POTABLE
<br />WATER TO COMPLY WITH NSF 61,'DRINKING WATER SYSTEM COMPONENTS -HEALTH EFFECTS'
<br />t.o3 wAJ>3uNTv
<br />A 1VACO MMERCEALOELECTRICLIGHT-DUN,MBTANTANEOUBDOMESTIC-WATER HEATERS:
<br />a. CONTROLS AND OTHER COMPONENTS: ONE YEAR.
<br />PART2 PRODUCTS
<br />2.01 COMMERCIAL. ELECTRIC LIGHT -DUTY. INSTANTANEOUS, OMESTIGWATER HEATERS
<br />A. BASS -OF -DESIGN PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS. PROVIDE PRODUCT INDICATED
<br />ON DRAWINGS OR COMPARABLE PRODUCT BY ONE OF THE FOLLOW ING:
<br />1. EEMAX
<br />2. OSCH CORPORATION
<br />C iA HEATING ELEMENTTWO; ELECTRIC. IMMERSION TYPE; WIRED FOR SIMULTANEOUS OPERATION UNLESS
<br />OTHERWISE INDICATED.
<br />2, TEMPERATURECONTROL: ADJUSTABLETHERMOSTAT.
<br />3. SAFETYCONTROL: HIGH -TEMPERATURE -LIMIT CUTOFF DEVICE OR SYSTEM.
<br />D. SEESCHEDULE FOR CAPACITYAND CHARACTERISTICS.
<br />2.0] WATER HEATERACCESSORIES
<br />,ACCORDANCE WITH THE WATER HEATER
<br />REQUIREMENTS OF ASHRAE 80.
<br />S. ALL WATER HEATERS SHALL BE PROVIDED WITH TEMPERATURE, PRESSURE ANDIOR VACUUM RELIEF VALVES IN
<br />ACCORDANCE WITH THE WATER HEATER MANUFACTURER'S INSTRUCTIONS WHICH COMPLY WITH THE
<br />REQUIREMENTS OF THE ATTHORITY HAVING JURISDICTION.
<br />C. PROVIDE FACTORY FABRICATED STANDS OR BRACKETS AS REQUIRED FOR WATER HEATER SUPPORT IF
<br />REQUIRED BY INSTALLATION LOCATION.
<br />3.01 A.
<br />EXAMINEROUGHINGINOF DOMESTIC-WATER-PIPINGSYSTEMTOVERIFYACTUALLOCATIONSOFCONNECTONE
<br />BEFORE WATER HEATER.
<br />3.02 INSTAJATION- WATER HEATERS
<br />A. INSTALL ELECTRIC. OMESTIGWATER HEATERS LEVEL AND PLUMB. ACCORDING TO LAYOUT DRAWINGS.
<br />ORIGINAL DESIGN, AND REFERENCED STANDARDS. MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCES.
<br />ARRANGE UNITS SO CONTROLS AND DEVICES NEEDING SERVICE ARE ACCESSIBLE. IN TALL SHUTOFF VALVES
<br />ON MESTIC WATER SUPPLY PIPING TO DOMESTIC WATER HEATERS AND ON DOMESTIGHOT-WATER OUTLET
<br />PIPING
<br />BLOB CONNECTIONS
<br />A. WATERHEATERS: WHERE INSTALLING PIPING ADJACENTTO ELECTRIC. DOMESTIC -WATER HEATERS.ALLOW
<br />SPACE FOR SERVICE AND MAINTENANCE OF WATER HEATERS. ARRANGE PIPING FOR EASY REMOVAL OF
<br />OMESTIGWATER HEATERS.
<br />FIELD QUALITY CONTROL
<br />E SYSTEM AND TEST FOR L AL
<br />A. PERFORM TESTS AND INSPECTIONS. REPAIR LEAKS PAID RETESTUNTIL NO LEAKS EXIST. OPER I-ATESTCHARG ELECTRICAL CIRCUITRY HAS S
<br />BEEN ENERGIZED. START UNITS TO CONFIRM PROPER OPERATION. TEST AND ADJUST CONTROLS AND
<br />SAFETIES. REPLACE DAMAGED AND MALFUNCTIONING CONTROLS AND EQUIPMENT.
<br />SLOE ADJUSTING
<br />A. WATER HEATERS: ADJUST INITIAL TEMPERATURE SET POINTS.
<br />END OF BECTON
<br />PLUMBING FIXTURES AND EQUIPMENT
<br />PART 1 GENEML
<br />101 SUBMITTALS
<br />A. SUBMITTAL REQUIREMENTS SHALL BE AS IDENTIFIED IN SPECIFICATION SECTION 220010 COMMON PLUMBING
<br />REQUIREMENTS.
<br />PART PRODUCTS
<br />2.01 COMMERCIAL FIXTURES(IAVATORIES, WATER CLOSETS)
<br />A. SAUS-DF-DESIGN PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, ROADE PRODUCT INDICATED
<br />1NAMERGANSTAND)NP BLEPRODUCT BY ONE OF THE FOLLOWING
<br />ARD
<br />2. CRANE PLUMBING LLC
<br />3. ELI4AY MANUFACTURING CO (STAINLESS STEEL SINKS ONLY)
<br />4. GERBER PLUMBING FIXTURE LLC
<br />5. JUSTMANUFACTURINGCO(STAINLEESSTEELSINKSONLY)
<br />8. KOHLERCO
<br />7. O USA INC.
<br />COMMERCIAL
<br />INDUSTRIES, LLC
<br />T O2 FIXTURE TRIM (TRIM FOR CLOSETS)
<br />A. BASIS -OF -DESIGN PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE PRODUCT INDICATED
<br />ON DRAWINGS OR COMPARABLE PRODUCT BY ONE OF THE FOLLOW ING:
<br />1. CHICAGO FAUCETS
<br />2. DANZE, INC.
<br />3. GROHE AMERII INC.
<br />VALVE COMI
<br />6. SPEAKMAN COMPANY
<br />). ZURN INDUSTRIES,LLC
<br />PART3 EXECUTION
<br />3.01 EXAMINATION
<br />A. EXAMINE ROUGHING -IN OF WATER SUPPLY AND SANITARY DRAINAGE AND VENT PIPING SYSTEMS TO VERIFY
<br />ACTUAL LOCATIONS OF PIPING CONNECTIONS BEFORE FIXTURE INSTALLATION EXAMINE COUNTERS, WALLS
<br />3.02 INSTALLATION OR SUITABLE CONDITIONS WHERE FIXTURES WILL BE INSTALLED.
<br />SINK AND MOP SERVICE BASIN INSTALLATION:
<br />1. INSTALL LAVATORIES AND SINKS LEVELAND PLUMB ACCORDING TO ROUGHING -IN DRAWINGS,
<br />2. INSTALL SUPPORTS. AFFIXED TO BUILDING SUBSTRATE. FOR WALL -MOUNTED LAVATORIES AND SINKS.
<br />INSTALLACCESSIBLEWALL OUNTEDLAVATORIESANDSINKSATHANDICAPPEDIELDERLYMOUNTING
<br />HEIGHT FOR PEOPLE WITH DISABILITIES OR THE ELDERLY, ACCORDING TO ICGANSI A11).1.
<br />4 LINSTALL WATER -SUPPLY PG
<br />EACH SUPPLY TO EACH SINK FAUCET. INSTALL STOPS IN
<br />OCATIONS WHERE THEY CAN BEFASILY REACHED FOR OPERATION.
<br />5. INSTALL PROTECTIVE SHIELDING PIPE COVERS AND ENCLOSURES ON EXPOSED SUPPLIES AND WASTE
<br />PIPING OF ACCESSIBLE LAVATORIES, COMPLY W nH REQUIREMENTS IN SECTION 220719'PLUMBING PIPING
<br />INSULATION."
<br />6 ALL APES AT THE FIXTURES, WHICH MAYBE EXPOSED TO VIEW, SHALL BE BRASS CHROME FINISH, FINISHED
<br />WITH CHROME
<br />B 1. AINSTALL WATER -CLOSETS LEVEL AND PLUMB ACCORDING TO ROUGHING-INDRAWINGS,
<br />2. IN TALL FLOOR -MOUNTED WATER CLOSETS ON BOWL-TG-DRAIN CONNECTING FITTING ATTgCHMENTS TO
<br />PIPING OR BUILDING SUBSTRATE.
<br />TTA'H SUPPLY PIPING TO SUPPORTS OR SUBSTRATE WITHIN PIPE SPACES BEHIND FIXTURES.
<br />4. INSTALL FRESH BATTERES IN SATTERY-POWERED, ELECTRONIC -SENSOR MECHANISMS.
<br />C. SUPPORT INSTALLATION: INSTALL SUPPORTS, AFFIXED TO BUILDING SUBSTRATE, FOR WALL -MOUNTED
<br />D. JOINT SEALING: SEAL JOINTS BETWEEN FIXTURES AND WALLS AND FLOORS USING SANITARY -TYPE, ONE -PART,
<br />MILDEW -RESISTANT SILICONE EEAIANT. MATCH SEALANT COLOR TO FIXTURE COLOR,
<br />BLOB CONNECTIONS
<br />A. CONNECT FIXTURES WITH WATER SUPPLIES AND SOIL, WASTE. AND VENT PIPING. USE SIZE FITTINGS AND
<br />TRANSITION FITTINGS AS REQUIRED MATCHING FIXTURES AND FIXTURE CONNECTION SIZESAS IDENTIFIED ON
<br />DRAW N_ N FT_NG OWSPACE FOR SERVICE AND AAINTENANCE. RE. WHERE INSTALLING PIPING ADJACENT TO
<br />3.04 ADJUSTING LL
<br />A. OPERNMANDADJUSTFIXTURESANDCONTROLS. REPLACE DAMAGED AND MALFUNCTIONING FIXTURES,
<br />FITTINGS. AND CONTROLS. ADJUST WATER PRESSURE AT FLUSHOMETER VALVES TO PRODUCE PROPER FLOW.
<br />INSTALL FRESH BATTERIES IN BATTERY -POWERED, ELECTRONIC -SENSOR MECHANISMS.
<br />SLOE CLEANING AND PROTECTION
<br />AND FITTINGS WITH _=ACTURERS REC MENDED --IN.
<br />HODSAN
<br />MATERALS
<br />PROTECTIVE COVERING FOR INSTALLED FIXTURES AND FITTINGS. O NOT ALLOW USE OF FIXTURES FOR
<br />TEMPORARY FACILITIES UNLESS APPROVED IN WRITING BYOW NER
<br />END OF SECTION
<br />SECTION 230010
<br />COMMON MECHANICAL REQUIREMENTS
<br />-I GENERAL
<br />'O' SUMMARY
<br />. WORK SHALL CONSIST OF O MATERIALS rvECESBARY FORTHE NSTALLATION OF
<br />A COMPLETE AND OPERATING PLUIMBING SYSTEMS,RA
<br />S. ALL MECHANICAL W ORK SHALL COMPLY WITH CURRENT STATE AND LOCAL BUILDING CODES AS REQUIRED BY
<br />THE AUTHORITIES HAVING JURISDICTION. THE INTERNATIONAL PLUMBING CODE, THE INTERNATIONAL
<br />MECHANICAL CODE, THE INTERNATIONAL FIRE CODE, INTERNATIONAL ENERGY CONSERVATION CODE AND
<br />APPLICABLE PUBLICATIONS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) SUCH AS NFPA90AAND
<br />DS (15, 55, 62.1,lb.i, 111, 135, 188j.
<br />THE
<br />HALL COMPLY W ITH THE REGUIMENTS OF THE GENERAL CONDITIONS, SUPPLEMENTAL
<br />C GENERALCONDITIONSOFTHEPROJECTSPECIFICATIONS, ALLCONTRACTDOCUMENTS.ANDANYBASE
<br />BUILDING SPECIFICATIONS AND BUILDING CRITERIA INCLUDED IN THIS PROJECT.
<br />D. DRAWINGS ARE DIAGRAMMATIC IN NATURE. TAKE DIMENSIONS FROM ARCHITECTURAL DRAWINGS.
<br />CERTIFIED EQUIPMENT DRAWINGS, AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK.
<br />E THE DRAWINGS INDICATE THE LOCATION, TYPE AND SIZES OF VARIOUS UTILITIES WITHIN THE SITE WHERE
<br />KNOWN. ANY RELOCATION OR REMODELING REWIRED MUST BE APPROVED BYTHE ARCHITECT BEFORE
<br />PROCEEDING. INVESTIGATE ALL UTILITIES SUCH AS GAS AND WATER AND MAKE ARRANGEMENTS WITH THE
<br />PROPER AUTHORITY TO PAY FOR ANY CHARGES ASSOCIATED WITH CONNECTING THOSE UTILITIES.
<br />F. GOOD WORKMANSHIPAND APPEARANCE ARE CONSIDERED EQUAL TO PROPER OPERATION.
<br />G. PROVIDE ALL CORE DRILLING, CHANNELING CUTTING, PATCHING TRENCHING AND BACKFILLAS REQUIRED FOR
<br />INSTALLATION OF MECHANICAL EQUIPMENT. HOLES SHALL BE FILLED WITH CONCRETE PATCH. SEAL HOLES
<br />ANDIOR WATER PROOFING WHERE NECESSARY AND REFINISH ALL REPAIR WOW ORIGINAL CONDITION WHERE DAMAGED BY WORN.
<br />H. MAKE PROVISIONS FOR SAFE DELNERYAND SECURE STOMGE OF ALL MATERIALS.
<br />I. OBTAIN AND ARRANGE FOR ALL PERMITS AND APPROVALS REOUIRED FOR THE EXECUTION OF THE WORK AND
<br />PAY ALL ASSOCIATED FEES,
<br />J. ALLEQUIPMEWMDPRODUCTSTOBETHOROUGHLYCLEANEDATTHEOMPLE IIONOFTHEWOWWITHALL
<br />STICKERS, MARKING, PACKING MATERIALS AND LIKE OR SIMILAR ITEMS REMOVED. REMOVE ALL RUBBISH,
<br />DEBRIS, SCRAPS OR OTHER MATERIAL NOT NEED FOR THE FINAL PRODUCT FROM THE JOB SITE.
<br />1 D A. THE MECHANICAL CONTRACTOR SHALL PROVIDE TO THE OWNER ONE (T YEAR (FROM THE DATE OF FINAL
<br />ACCEPTANCE) WARRANTY OF ALL MECHANICAL EQUIPMENT AND SYSTEMS PROVIDED UNDER THIS CONTRACT,
<br />ALL DEFECTIVE EQUIPMENT OR MATERIALS WHICH APPEAR WRING THE WARRANTY PERIOD SHALL BE
<br />REPLACED OR REPAIRED BYTHE MECHANICAL IN A TIMELY FASHION.
<br />20 T2 PRODUCTS
<br />`ENE
<br />RAL
<br />A L EQUIPMENTAND ACCESSORIES NECESSARY WHETHER SPECIFICALLY
<br />STATEDOR NOT TO -THE REQUIRED MECHANICAL SVSTEMSCOMPLETEAND OPERATIONAL.
<br />B. ALL EQUIPMENT PROVIDED SHALL BE NEW EXCEPT AS OTHERWISE STATED ON THE DRAWINGS. ALL EQUIPMENT
<br />PROVIDED SHALL BE ACCEPTABLE FOR INSTALLATION BY THE AUTHORITY HAVING JURISDICTION.
<br />C. THE EQUIPMENT SCHEDULES ON THE DRAWINGS AND THROUGHOUT THESE SPECIFICATIONS PROVIDE
<br />MANUFACTURERAND MODEL INFORMATION. THIS SERVES AS THE STANDARD OF QUALITY FOR EQUIPMENT BY
<br />DIFFERENT MANUFAITIFIRI THE SPECIFICATION
<br />ALLOWS
<br />FOR
<br />1E USE
<br />FOR THE EQUIPMENT HOWEVER. REFER TO THEARCHITECTURAL SPEC FICATIONS FOR SUBSTITUTIONS BY
<br />MANUFACTURERS OTHER THAN THOSE LISTED IN THE SPECIFICATIONS. WHERE NO EQUIPMENT SPECIFICATION
<br />IS PROVIDED THE SCHEDULED EQUIPMENT MANUFACTURER SHALL SERVE AS THE BASIS OF DESIGN AND ANY
<br />SUBSTITUTIONS SHALL MEET THE QU STANDARD SET BYTHE BASIS OF DESIGN.
<br />D. CONTRACTOR TO BE RESPONSIBLE FOR MY CHANGES AND COSTS TO ACCOMMODATE ANY EQUIPMENT
<br />EXCEPT THE MANUFACTURER E EQUIPMENT SCHEDULES, DRAWING NOTES ANDIOR CALLED OUT
<br />WITHIN THE SPECIFICATIONS. IF NO SCHEDULES ARE INCLUDED ON THE DI -WING THAN THE FIRST NAMED IN
<br />THE SPECIFICATION IS THE STANDARD OF DESIGN.
<br />2.02 IDENTIFICATION
<br />A. PROVIDE PIPE AND EQUIPMENT IDENTIFICATION IN ACCORDANCE WITH ANSI A13.1 AND OR THE BUILDING
<br />STANDARDS.
<br />2.03 MISCELLANEOUSSPECIALTIES
<br />1 =D, PROVIDE THE TYPE MD SIZE OF ACCESS D_
<br />LOCATED WITH THE WALL OR CAVITY. PROVIDE FIRE RATED DOORS WHERE INSTALLEDIIN FIRE RATED
<br />ASSEMBLIES.
<br />PART3 EXECUTION
<br />S01 GENERAL
<br />A. OBTAIN AND ARRANGE FOR ALL PERMITS AND APPROVALS REQUIRED FOR THE EXECUTION OF THE WORKAND
<br />PAYALLLLASSOCIATED FEE'
<br />. G A.-ACKPILL AS REQUIRED FOR
<br />B INSTALLATION OF MECHANICAL EQUIPMENT. HOLES SHALL BE FILLED WITH NCONCRETE PATCH. SEAL HOLES,
<br />FIREPROOFING WHERE NECESSARY, AND REFINISH ALL REPAIR WORK TO ORIGINAL CONDITION WHERE
<br />DAMAGED SY MECHANICAL WORK
<br />C. ALL EQUIPMENT AND PRODUCTS TO BE THOROUGHLY CLEANEDAT THE COMPLETION OF THE WORK WITH ALL
<br />STICKERS, MARKINGS AND THE LIKE SHALL BE REMOVED. REMOVE ALL RUBBISH, DEBRIS, SCRAPS AND THE LIKE
<br />3.02 FLUSHINGAND CLEANING
<br />A. BEFORE FINAL CONNECTIONS ARE MADE IN THE PIPING SYSTEMS, SYSTEMS SHALL BE BLOWN OUT WITH AIR
<br />AND THEN COMPLETELY WASHED OUT WITH CLEANING COMPOUNDS COMPATIBLE WITH FINAL FLUID TO AVOID
<br />CONTAMINATION. THE SYSTEMS SHALL THEN BE FLUSHED FOR THE COMPLETE REMOVAL OF ALL FOREIGN
<br />MATERIALS. FURNISH ALL TEMPORARY CONNECT IONS,VALVES, ETC., REQUIRED FORTHIS PURPOSE.
<br />END OF BECTON
<br />TESTING, =5DSSNCING
<br />PAR
<br />101T iTUMMARY
<br />A. HE TESTING, ADJUSTING AND BALANCING OF THE SYSTEMS SHALL BE PART OF THIS CONTRACT, INCLUDE IN
<br />BID THE COST OF THIS WORK. THE BALANCING CONTRACTOR SHALL BE PABC CERTIFIED, NEBB CERTIFIED,
<br />TAB B CERTIFIED ORA REGISTERED PROFESSIONAL ENGINEER.
<br />B. ALL REPORTS SHALL BE SUBMITTED ON STANDARD AAO, NEED OR TABS FORMS.
<br />PART 2 PRODUCTS (NOT APPLICABLE)
<br />3 CUFTION
<br />3.01T TAB SPECIALISTS
<br />A. SUBIECTTO COMPLIANCE WITH REQUIREMENTS, ENGAGE ATABS OF NEBB CERTIFIED BALANCING
<br />CONTRACTOR COORDINATE WITH BUILDING ENGINEER AND LAN WORD FOR ANY BUILDING STANDARD TPB
<br />COMPANIES.
<br />3.02 SUMMARY
<br />A. SET THE SYSTEM AIR FLOW RATES AND WATER FLOW RATES WITHIN THE FOLLOWING TOLERANCES: PLUS 10
<br />PERCENT To MINUS 5 PERCENT
<br />B. THE AR, HYDRONIC AND DOMESTIC HOT WATER RECIRCUTATION SYSTEMS SHALL BE TESTED, ADJUSTED AND
<br />SAIANCED TO THE QUANTITIES LISTED.
<br />C. A REPORT SHALL BE SUBMITTED TO THE OWNER AND ENGINEER FOR REVIEW.
<br />END OF SECTION
<br />SECTION 230713
<br />MECHANICAL INSULATION
<br />-1 GENERAL
<br />101 SUMMARY
<br />A. SEE SECTION 23 0 - METAL DUCTS FOR DUCT LINING REQUIREMENTS.
<br />S. SECTION INCLUDES INSULATING THE FOLLOWING DUCT SERVICES:
<br />1. INDOOR, CONCEALED SUPPLY AND OUTDOOR AIR.
<br />2. INDOR. CONCEALED RETURN LOCATED IN UNCONDITIONED SPACE.
<br />3. SECTION INCLUDES INSULATING THE FOLLOWING HVAC EOUIPMENT THAT IS NOT FACTORY INSULATED:
<br />PART2 PRODUCTS
<br />2.01 MINERALFIBER
<br />A. MINERAL-FIBERBLANKETINSI.-ON: MINERAL OR GLASS FIBERS BONDED WITH ATHERMOSETTING RESIN.
<br />COMPLY WITH ASTM C 553, TYPE II AND ASTM C 128D, TYPE III WITH FACTORY-PPPLIED FSK JACKET ORTYPE III
<br />WITH FACTORYAPPUED FSP JACKET.
<br />1. PRODUCTS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE ONE OF THE FOLLOWING:
<br />a CERTAINTEEDCORP,;SOFTTOUCHDUCTWRAP.
<br />E. JOHNS MANVILLE; MICROUTE.
<br />e. KNAUF INSULATION: FRIENDLY FEEL DUCT WRAP.
<br />i. MANSON INSULATION INC.; ALLEY WRAP.
<br />g. OWENS CORNING; SOFTRALL-SERVICE DUCT WRAP.
<br />-3 EXE
<br />3.01IREQUIREMENTS
<br />A.
<br />INSTALL INS ULATIONMATERIALS,ACCESSORIES, AND FINISHES WITH SMOOTH, STRAIGHT, AND EVEN SURFACES;
<br />FREE OF VOIDS THROUGHOUT THE LENGTH OF PIPING INCLUDING FITTINGS, VALVES, AND SPECIALTIES.
<br />S. INSTALL INSULATION MATERIALS, FORMS, VAPOR BARRIERS OR RETARDERS. JACKETS. AND THICKNESSES
<br />REWIRED FOR EACH ITEM OF PIPE SYSTEM AS SPECIFIED IN INSULATION SYSTEM SCHEDULES.
<br />C. INSTALL ACCESSORIES COMPATIBLE WITH INSULATION MATERt- AND SUITABLE FOR THE SERVICE. INSTALL
<br />ACCESSORIES THAT DO NOT CORRODE, SOFTEN, OR OTLERWISEATTACK INSU OR JACKET IN EITHEIR
<br />WET OR DRY STATE
<br />D. INSTALL INSULATION WITH LONGITUDINAL SEAMS AT TOP AND BOTTOM OF HORIZONTAL RUNS.
<br />E. INSTALL MULTIPLE LAYERS OF INSUI NTION WITH LONGITUDINAL AND END BEAMS STAGGERED.
<br />3.02 PIPING AND DUCT INSULATION SCHEDULES
<br />A. ALL PIPING AND DUCT INSULATION SHALL COMPLY W ITT THE TYPE AND INSULATION THICKNESS NOTED IN THE
<br />SCHEDULE INCLUDED ON THE DRAWINGS.
<br />END OF SECTION
<br />SECTION 2330X0
<br />DUCTS AND ACCESSORIES
<br />PART1 GENERAL
<br />1.01 SUMMARY
<br />A. SECT ION INCLUDES:
<br />1. SINGLE -WALL RECTANGULAR DUCTS AND FITTINGS.
<br />TERIALS.TS AND FITTINGS.
<br />4. DUCT LINER. MA
<br />5. SEALANTS AND GASKETS.
<br />6. HANGERS AND SUPPORTS.
<br />7. MANUALVOLUMEDAMPERS.
<br />8. FIREDAMPERS.
<br />9. COMBINATION FIRE AND SMOKE DAMPERS.
<br />12. DUCT -MOUNTED ACCESS DOORS.
<br />13 FLEXIBLE CONNECTORS,
<br />14. FLEXIBLE DUCTS,
<br />15. GRILLES, REGISTERSAND DIFFUSERS.
<br />-2 PRODUCTS
<br />2.01 SINGLE -WALL RECTANGULAR DUCTS AND FITTINGS
<br />A. GENERALFABRICATIONREQUIREMENTS: FUEMBUE' BASED ON
<br />INDICTS STATGPRESSURE CLASS UNLESS OTHERWISE INDICATED.
<br />2.02 SINGLEROUND AN
<br />A. GENERAL FABRICATION REQUIREMENTS: COMPLY WITH SMAMNS'HVACDUCT CONSTRUCTIONSTANDARDS -
<br />METALAND FLEXIBLE,' CHAPTER 3. 'ROUND. OVAL, AND FLEXIBLE DUCT. -BASED ON INDICATED
<br />STAT C-PRESSURE CLASS UNLESS OTHERWISE INDICATED.
<br />2.03 SHE ETMETALMATERIALS
<br />A. GENERALMATERIALREQUIREMENTS: COMPLY WITH SMACNA'S"HVACDUCT CONSTRUCTION STANDARDS -
<br />METHODS UNLESS OTHER WISE INDICATED. SHEET METAL MATERIALS SHALL BE FREE OF PITTING, SEAM MARKS,
<br />ROLLER MARKS. STAINS. DISCOLORATIO D AND OTHETALIMPERFECTIONS.
<br />H
<br />2.04 DUCT LINER
<br />A. FIBROLI LASS DUCT LINER: COMPLY WITH ASTM C 1071. NFPA 90A. OR NFPA 90B: AND WITH NAIMA AH124,
<br />"FIBROUS GLASS DUCT LINER STANDARD.-
<br />2.05 HANGERSANDSUPPORTS
<br />B FLEXIBLE; TABLE Si SRECTANGULAR DUCT HANGERS MINIMUM SIZE; AND TABLE 5-2.'MINIMUM HANGER SIZES
<br />FOR ROUND DUCT."
<br />C. STEEL CABLES FOR GALVANIZED -STEEL DUCTS: GALVANIZED STEEL COMPLYING WITH ASTM A 603,
<br />2.08 MANUAL VOLUME DAMPERS
<br />A. STANDARD, STEEL, MANUAL VOLUME DAMPERS AS DETAILED OR NOTED:
<br />2.07 FLANGE CONNECTORS ORLA
<br />y FABRICATED, SLGEON TRANSVERSE FNGE
<br />A CONNECTORS, GAS ET. AND CT
<br />COMPONENTS.
<br />S. MATERIAL GALVANIZED STEEL.
<br />C. GAGEANDSHAPE: MATCH CONNECTING DUCTWORK
<br />2.08 TURNINGVANES
<br />A. MANUFACTURED TURNING VANES FOR METAL DUCTS: CURVED BLADES OF GALVANIZED SHEET STEEL:
<br />SUPPORT WITH BARS PERPENDICULAR TO BLADES SET; SET INTO VANE RUNNERS SUITABLE FOR DUCT
<br />2.09A. DUCT-WPUNTED ACCESS DOORS: FABRICATE ACCESS PANELS ACCORDING TO SMACNA'S-HVAC DUCT
<br />CONSTRUCTION STANDARDS -METAL AND FLEXIBLE'; FIGURES 7-2, DUCT ACCESS ODORS AND PANELS,"AND
<br />7-3, "ACCESS DOORS - ROUND DUCT."
<br />2AS DUCT ACCESS PANEL ASSEMBLIES
<br />A. LABELED ACCORDING TO UL I e78 BY AN NRTL.
<br />S. RANELANDFRAME: MINIMUM THICKNESS 0.042SINCHSTAINLESSSTEEL.
<br />PLYC. FASTENERS. STAINLESSETEEL. PANETENERBSHAULNOTPEINETRATEDUCTWAUL.
<br />WITH NFPA e6, GREASE TIGHT, HIGH TEMPERATURE CERAMIC FIBER RATED FOR MINIMUM
<br />D 20ID0 DEG FONT
<br />E. MINIMUM PRESSURE RATING: ISFNCH WG, POSITIVE OR NEGATIVE.
<br />2.11 FLEXIBLE DUCTS
<br />A. INSULATED. FLEXIBLE DUCT: UL 181, CLASS 1, ALUMINUM LAMINATE AND POLYESTER FILM WITH LATEX
<br />ADHESIVE SUPPORTED BY HELICALLY WOUND, SPRING -STEEL WIRE; FIBROUSGLASS INSULATION;
<br />2, MAXIMUMAIRVELOCITYN4000FPM, SATINS AND ILO -INCH WG NEGATIVE,
<br />3. TEMPERATURERANGE: MINUS20TO PLUS210 DEG F.
<br />4. INSULATION R-VALUE: R-6 MINIMUM INSTALLED PERFORMANCE (1-SIB INCH MINIMUM THICKNESS),
<br />S. FLEXIBLEDUCTCONNECTORS:
<br />1. CLAMPS: STAINLESSSTEEL BAND WITH CADMIUM -PLATED HEX SCREW TO TIGHTEN BAND WITH A
<br />WORM -GEAR ACTION IN SIZES 3 THROUGH 18INCHES, TO SUIT WCT SIZE.
<br />2.12 GRILUES, REGISTERS AND
<br />SI
<br />A. REFER TO RULE FOR REQUIREMENTS FOR GRILLES, REGISTERS AND DIFFUSERS.
<br />EXECUTION
<br />3.01 3DUCT INSTALLATION
<br />A. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION ANDARRANGEMENT OF DUCT
<br />SYSTEM, INDICATED DUCT LOCATIONS. CONFIGURATIONS. AND ARRANGEMENTS WERE USED TO SIZE DUCTS
<br />ANDCPLCULATE FRICTION LOSS FOR AIR -HANDLING EQUIPMENT SIZING AND FOR OTHER DESIGN ROVED ON
<br />CONSIDERATIONS, INSTALL DUCT SYSTEMS AS INDICATED UNLESS DEVILATI-S TO _KYOUTARE
<br />SHOP
<br />B. INSTTAL DUCTSACCOBOONGTOSMACNA'S'HVACDUCT CONSTRUCTION STANDARDS- METAL AND FLEXIBLE"
<br />UNLESS OTHERW LSE INDICATED.
<br />C. DURING CONSTRUCTION, OPEN ENDS OF DUCTWORK SHALL BE COVERED. SEALED AND PROTECTED FROM
<br />FOREIGN DEBRIS, DUST AND DIRT.
<br />3.02 DUCT SEALING
<br />A. SEAL DUCTS FOR DUCT STATIC -PRESSURE, SEAL CLASSES, AND LEAKAGE CLASSES SPECIFIED IN'DUCT
<br />CONSTRUCTIONSTANDARDSN METALANDFTH ILESPECE ICATION ACCORDING TO S HVAC DUCT
<br />3.03 HANGER AND SUPPORT INSTALLATION
<br />A. COMPLY WITH SMACNA'S'HVAC DUCT CONSTRUCTION STANDARDS- METAL AND FLEXIBLE; CHAPTER 5,
<br />'HANGERS AND SUPPORTS."
<br />3.04 DUCTSCHEDULE
<br />A. EUPPLYDUCTS:
<br />1. �UCTSEC
<br />, F RI -ES, HEAT PUMPS, ANDTERMIN& UNITS
<br />CLASS,IPH S=S N. WG.
<br />b. MINIMUM SMACNA SEAL
<br />c. SMACNA LEAKAGE CIASS FOR RECTANGUTAR: 12.
<br />tl. SMACNA LEAKAGE CLASS FOR ROUND: 12,
<br />3.05 ACCESSORYINSTALLATION
<br />A. INSTALL DUCT ACCESSORIES ACCORDING TO APPLICABLE DETAILS IN SMACNA'S "HVAC DUCT CONSTRUCTION
<br />STANDARDS -METAL AND FLEXIBLE' FOR METAL DUCTS AND IN NAIMA AH118,'FIBROUS GLOSS DUCT
<br />RE D
<br />3.06A. INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS,
<br />B. CHECKLOW1 N OF OUTLETS AND INLETS AND MAKE NECESSARYADJUSTMENTS IN POSITION TO CONFORM
<br />WITH ARCHITECTURAL FEATURES. SYMMETRY. AND LIGHTING ARRANGEMENT.
<br />C. CEILING-MOUNTEDOUTRETSANDINLET3: DRAWINGSINDICATEGENERALARRANGEMENTOFDUCT3,FITTINGS.
<br />AND ACCESSORIES. AIR OUTLET AND INLET LOCATIONS HAVE BEEN INDICATED TO ACHIEVE DESIGN
<br />REQUIREMENTS FOR AIR VOLUME, NOISE CRITERIA, AIRFLOW PATTERN, THROW, AND PRESSURE DROP. MAKE
<br />FINAL LOCATIONS WHERE INDICATED, AS MUCH AS PRACTICAL, FOR UNITS INSTALLED IN LAY -IN CEILING
<br />PANELS, OCATE UNITS IN THE CENTER OF PANEL COORDINATE EXACT LOCATION WITH ARCHITECTURAL
<br />REFLECTED CEILING PLAN. WHERE ARCHITECTURAL FEATURES OR OTHER ITEMS CONFLICT WITH
<br />INSTALLATION, NOILFY ARCHITECT FOR A DETERMINATION OF FINAL LOCATION.
<br />U. INSTALL DIFFUSERE TO DUCTWORK WITH AIR TIGHT CONNECTION. E
<br />HE E SA E. EDAE
<br />F. INSTALL DIFFUSERS, REGISTERS, AND GRILLES WITH AIRTIGHT CONNECTIONS TO DUCTS AND TO ALLOW
<br />SERVICE AND MAINTENANCE OF DAMPERS. AIR EXTRACTORS. AND FIRE DAMPERS,
<br />G. PANT DUCTWORK VISIBLE BEHIND AR OUTLETS AND INLETS MATTE BLACK. REFERTOSECTION099123.
<br />H. INSTALL AND SUPPORT ALL GRDS PER MANUFACTURER'S RECOMMENDATIONS.
<br />1. GRDS WEIGHING LESS THAN 20 POUNDS SHALL BE POSITIVELYATTACHED TO COUNGSUSPENBONMAIN
<br />2 SHALL HAVE TWO NO, 12 GAUGE HANGERS CONNECTED FROM THE TERMINAL OR SERVICE TO THE CEILINGS
<br />HANGERS OR TO THE STRUCTURE ABOVE, THESE W IRES MAY SE SIACK.
<br />3. GROSWEIGHING GREATER THAN 56 POUNDS SHALL BE SUPPORTED DIRECTLY FROM THE STRUCTURE
<br />ABOVE BY APPROVEDHANGERE.
<br />I. FORWARD GRID AK FACTORS TO TESTING, ADJUSTING AND BALANCING CONTRACTOR.
<br />END OF SECTION
<br />BE-
<br />PART1 GENERAL FANS
<br />1.01 SUMMARY
<br />A. THIS SECTION INCLUDES THE FOLLOW ING:
<br />1. CEILING -MO UNTINGVENTIATORS.
<br />A.
<br />PRODUCTS
<br />2.01 FANS
<br />A. PROVIDE THE FAN INDICATED IN THE EQUIPMENT SCHEDULE OR AN EQUAL BY:
<br />1. ACME ENGINEERING A MFG. WRF.
<br />3, GREENHECK,TWIN CITY IN COMPANY
<br />4. L MPANY,
<br />202 5 REFER SCHEDULE FOR CgPACITY AND CHARACTERISTICS
<br />PART 3EXECUTION
<br />3.01 INSTALLATION
<br />A. CEILINGUNITS: SUSPEND UNITS FROM STRUCTURE; USE STEEL WIRE OR METAL STRAPS.
<br />3.02 CONNECTIONS
<br />REQUIREMENTS ARE SPECIFIED IN OTHER DIVISION SECTIONS.
<br />MAKE FINAL DU-T
<br />D.
<br />CONNECTIONSIWITH FLEXIBLE CONNECTORS. FLEXIBLE CONNECTORS PRE SPECIFIEDIN DIVISION 233ECTION
<br />'AIR DUCT ACC ESORIES."
<br />3.03 ADJUSTING
<br />A. ADJUST DAMPER LINKAGES FOR PROPER DAMPER OPERATON.
<br />B. ADJUST BELTLICABL TENSION, IF APPE.
<br />C. REFERTO DIVISION 23 SECTION "TESTING,ADJUSTING, AND SALANCING FOR HVAC' FOR TESTING, ADJUSTING,
<br />AND BAL-AINCING PROCEDURES,
<br />D. REPLACE FAN AND MOTOR PULLEYS AS REQUIRED TO ACHIEVE DESIGN AIRFLOW.
<br />E. LUBRICATESEARINGS.
<br />END OF SECTION
<br />�I,blc LAWRENCE
<br />GROUP
<br />St. LOUTS
<br />319 North 4th Street
<br />Suite 1000
<br />St. Louis, Missouri 63102
<br />(314)231-5700
<br />PROJECTTEAM:
<br />GENERAL CONTRACTOR:
<br />TBD
<br />PROFESSIONAL ENGINEER:
<br />.IMEG
<br />IMEG
<br />7600 E Orchard Road, Suite 250-S
<br />Greenwood Village, CO 80111
<br />Phone: 303.796.6000
<br />MEG Project No.: 23000048.10
<br />PROFESSIONAL SEAL:
<br />E
<br />Oy
<br />P
<br />SJONAI E?
<br />OZ4.20Z3
<br />ExP. o� t o•z oz4
<br />PROJECT TITLE'.
<br />O
<br />6>
<br />�VMJ
<br />� I
<br />a
<br />W
<br />W
<br />`Y)ILL!
<br />I
<br />..0
<br />L
<br />Z O
<br />W
<br />W
<br />U
<br />-
<br />Q
<br />Z
<br />W
<br />H
<br />w
<br />m
<br />J
<br />J
<br />Q
<br />-
<br />U
<br />W
<br />0
<br />U
<br />M
<br />M
<br />N
<br />U
<br />06
<br />N
<br />N
<br />The Professional ArcM1itect'e seal Ahmd W thie sheet
<br />applies only [o the material aM items shown on this
<br />,t eet All lowing, ineUruments or other documents
<br />ex thftg Nis be by
<br />rot
<br />seal shall not consid-d propared
<br />this architect, and this architect expressly disclaims any
<br />antl all responsibility for such plans, tlmwings or
<br />documents not exhibiting Ihls seal.
<br />This lowing and details on it are the sole propertyof the
<br />amM1Rec1 antl may he.- tar Nis specific project only.
<br />It shall not be loaned, copied or reproduced. In wor
<br />pad, or for any other purpose Dr project without the
<br />wrtlten wnsent of the architect.
<br />No Description
<br />Date
<br />SHEETTITLE:
<br />MECHANICAL AND
<br />PLUMBING
<br />SPECIFICATIONS
<br />PROJECT NUMBER: SHEET NUMBER:
<br />2021932.001
<br />D.- Sy.
<br />ABN
<br />Ia:Da Dace:
<br />May 23, 2023
<br />
|