Laserfiche WebLink
S\MBnck\development review\2021\12-Dec\PW2101-023 Fee Calc Printed 12/23/2021 10:26 AM <br /> Project Name Rockefeller Square Phase 2 (2022 Rate) Traffic Reviewer MGB <br /> Project Location 2611 Rockefeller Ave Dev Reviewer TN <br /> Project Description 30 Multifamily Units (4 SFR TBR) Planner <br /> Received Date Due Date Review Date 12/23/2021 File# PW2101-023 <br /> Area Type OCBD 1=ISW Everett Remainder <br /> Traffic Mitigation Fee Estimate(NOTE -Fees are calculated at permitting and rates may change) <br /> X Proposed Development Traffic Fee Estimate(From Worksheet 1, attached) $52,122 <br /> X Existing Site Use Credit(From Worksheet 1, attached) - $35,027 <br /> X Estimate of Net Traffic Impact Fee (Including Existing Use Credit) = $17,094 <br /> _No Traffic Mitigation Fee Estimated <br /> X Proposed Land Use Trip Generation per MBrick calculations (30 Apts<=2 BR, 25% reduction for non-SOV) <br /> X Credit for Phase 1 Overpayment Applied <br /> Worksheet 1 -Traffic Mitigation Fee and Credit Estimates <br /> Proposed Land Use Units Size Fee/Unit Impact Fee <br /> 30 Unit Apartment 17.4 x = $0 <br /> 25%Reduction for Transit PM Peak Trips 13.05 x $3,994 = $52,122 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> Fees may be recalculated at submittal if changes occur Total $52,122 <br /> Existing Land Use Units Size Fee/Unit Impact Fee <br /> Single Family Residence Dwelling Units 4 x $3,994 = $15,976 <br /> Overpayment on Phase 1 PM Peak Trips 4.77 x $3,994 = $19,051 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> Credits only apply if use was permitted within 10 years Total $35,027 <br /> City of Everett Staff Use Only <br />