Laserfiche WebLink
S\MBrick\development review\2021\12-Dec\PW2101-023 Fee Calc Printed 12/23/2021 10:26 AM <br /> Project Name Rockefeller Square Phase 2 (2021 Rate) Traffic Reviewer MGB <br /> Project Location 2611 Rockefeller Ave Dev Reviewer TN <br /> Project Description 30 Multifamily Units (4 SFR TBR) Planner <br /> Received Date Due Date Review Date 12/23/2021 File# PW2101-023 <br /> Area Type DCBD DSW Everett Remainder <br /> Traffic Mitigation Fee Estimate(NOTE -Fees are calculated at permitting and rates may change) <br /> X Proposed Development Traffic Fee Estimate (From Worksheet 1, attached) $41,721 <br /> X Existing Site Use Credit(From Worksheet 1, attached) - $28,038 <br /> X Estimate of Net Traffic Impact Fee (Including Existing Use Credit) = $13,683 <br /> No Traffic Mitigation Fee Estimated <br /> X Proposed Land Use Trip Generation per MBrick calculations(30 Apts<=2 BR, 25% reduction for non-SOV) <br /> X Credit for Phase 1 Overpayment Applied <br /> Worksheet 1 -Traffic Mitigation Fee and Credit Estimates <br /> Proposed Land Use Units Size Fee I Unit Impact Fee <br /> 30 Unit Apartment 17 4 x = $0 <br /> 25% Reduction for Transit PM Peak Trips 13.05 x $3,197 = $41,721 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> Fees maybe recalculated at submittal if changes occur Total $41,721 <br /> Existing Land Use Units Size Fee/Unit Impact Fee <br /> Single Family Residence Dwelling Units 4 x $3,197 = $12,788 <br /> Overpayment on Phase 1 PM Peak Trips 4.77 x $3,197 = $15,250 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> x = $0 <br /> Credits only apply if use was permitted within 10 years Total $28,038 <br /> City of Everett Staff Use Only <br />