My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2611 ROCKEFELLER AVE ROCKEFELLER SQUARE 2 2024-08-12
>
Address Records
>
ROCKEFELLER AVE
>
2611
>
ROCKEFELLER SQUARE 2
>
2611 ROCKEFELLER AVE ROCKEFELLER SQUARE 2 2024-08-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2024 8:26:35 AM
Creation date
8/5/2024 11:06:54 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2611
Tenant Name
ROCKEFELLER SQUARE 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 SWMMWW MINIMUM REQUIREMENTS SUMMARY <br /> MR : MINIMUM REQUIREMENT <br /> SSP : STORMWATER SITE PLAN <br /> ' MR#1 PREPARATION OF STORMWATER SITE PLAN: <br /> Stormwater site plan follows section 6.10 of the City of Everett's standards. <br /> MR #2 CONSTRUCTION OF STORMWATER POLLUTION PREVENTION <br /> PLAN (SWPPP): <br /> Refer to section IV for SWPPP. <br /> ' MR#3 SOURCE CONTROL OF POLLUTION: <br /> NA. No source control pollutants pertain to the proposed project, therefore no BMP's are <br /> required for the proposed project. <br /> MR #4 PRESERVATION OF NATURAL DRAINAGE SYSTEMS AND <br /> OUTFALLS: <br /> The developed site drainage will be discharged into the existing combined sewer system <br /> that drains to the south within a closed pipe system to follow its natural drainage path. <br /> MR#5 ONSITE STORMWATER MANAGEMENT: <br /> rFor onsite stormwater management (MR#5) list# 2 was used per Vol 1 section 2.5.5 of the <br /> SWMMWW. Full dispersion was considered first however it was deemed infeasible due to <br /> ' the lack of native vegetation. Downspout full infiltration and bioretention was deemed <br /> infeasible as the site lacks the necessary area to accommodate infiltration facilities within <br /> ' the required setbacks. Downspout Dispersion is infeasible because the site cannot provide <br /> the required vegetated flow paths. Perforated stub out connections are also not feasible. <br /> ' The runoff from the roof will be tight lined to a detention system on the south side of the <br /> project to continue to City's combined sewer system. <br /> ' Insight Engineering Co. - Stormwater Site Plan 12/30/20 <br /> -5- <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.