Laserfiche WebLink
1 <br /> MR#6 RUNOFF TREATMENT: <br /> ' The project is exempt from water quality as the project discharges to the combined sewer <br /> and any new PGHS will be minimal. <br /> MR#7 FLOW CONTROL: <br /> Flow control requirements will be met by a 33LF 4-foot diameter detention pipe on the <br /> south side of the building. The existing basin was modeled as existing conditions per <br /> section 6-10 of the City Design and Construction Standards and Specifications. <br /> MR#8 WETLANDS PROTECTION: <br /> There are no wetlands located within the site. <br /> MR#9 OPERATIONS AND MAINTENANCE: <br /> Please refer to Appendix G for Operation and Maintenance Manual. <br /> I <br /> 1 <br /> ' Insight Engineering Co. -Stormwater Site Plan 12/30/20 <br /> - <br />