My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2611 ROCKEFELLER AVE ROCKEFELLER SQUARE 2 2024-08-12
>
Address Records
>
ROCKEFELLER AVE
>
2611
>
ROCKEFELLER SQUARE 2
>
2611 ROCKEFELLER AVE ROCKEFELLER SQUARE 2 2024-08-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2024 8:26:35 AM
Creation date
8/5/2024 11:06:54 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2611
Tenant Name
ROCKEFELLER SQUARE 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the required setbacks. Downspout Dispersion is infeasible because the site cannot provide <br /> ' the required vegetated flow paths. Perforated stub out connections are also not feasible. <br /> The runoff from the roof will be tight lined to a detention system on the south side of the <br /> project to continue to City's combined sewer system. <br /> ' 1. The purpose of this SWPPP is to describe the proposed construction <br /> activities and all temporary and permanent erosion and sediment <br /> control (TESC) measures, pollution prevention measures, <br /> ' inspection/monitoring activities, and recordkeeping that will be <br /> implemented during the proposed construction project. The <br /> objectives of the SWPPP are to: <br /> ' 2. Implement Best Management Practices (BMPs) to prevent erosion <br /> and sedimentation, and to identify, reduce, eliminate or prevent <br /> ' stormwater contamination and water pollution from construction <br /> activity. <br /> ' 3. Prevent violations of surface water quality, ground water quality, or <br /> sediment management standards. <br /> ' 4. Prevent, during the construction phase, adverse water quality <br /> impacts including impacts on beneficial uses of the receiving water <br /> by controlling peak flow rates and volumes of stormwater runoff at <br /> the Permittee's outfalls and downstream of the outfalls. <br /> 5. This SWPPP was prepared using the Ecology SWPPP Template. <br /> ' This SWPPP was prepared based on the requirements set forth in the <br /> Construction Stormwater General Permit and in the Stormwater <br /> Management Manual for Western Washington (SWMMWW 2014). <br /> The 13 BMP Elements <br /> ' Element#1 —Mark Clearing Limits <br /> To protect adjacent properties and to reduce the area of soil exposed to <br /> 1 construction,the limits of construction will be clearly marked before land- <br /> disturbing activities begin. <br /> ' Element#2—Establish Construction Access <br /> Construction access or activities occurring on unpaved areas shall be minimized, yet where <br /> necessary, access points shall be stabilized to minimize the tracking of sediment onto <br /> ' Insight Engineering Co. -Stormwater Site Plan 12/30/20 <br /> - 15 - <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.