My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2611 ROCKEFELLER AVE ROCKEFELLER SQUARE 2 2024-08-12
>
Address Records
>
ROCKEFELLER AVE
>
2611
>
ROCKEFELLER SQUARE 2
>
2611 ROCKEFELLER AVE ROCKEFELLER SQUARE 2 2024-08-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2024 8:26:35 AM
Creation date
8/5/2024 11:06:54 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2611
Tenant Name
ROCKEFELLER SQUARE 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Ipublic roads, and wheel washing, street sweeping, and street cleaning shall be employed to <br /> prevent sediment from entering state waters. <br /> I Install the temporary construction entrance, according to the approved construction <br /> plans, prior to any clearing or grading activities. Maintain until the access road is <br /> paved. <br /> IElement#3—Control Flow Rates <br /> The flow is minimal no BMP's are needed. <br /> IElement#4—Install Sediment Controls <br /> Use BMP C220 Storm Drain Inlet Protection. Install catch basin filters, according to the <br /> I <br /> approved construction plans, as catch basins become operable. Maintain until all <br /> construction activities are completed. <br /> IElement#5—Stabilize Soils <br /> BMPs C121, C123, C120, and C140 will be used to stabilize soils. Exposed and un- <br /> I worked soils shall be stabilized with the application of effective BMPs to prevent <br /> erosion throughout the life of the project. <br /> Apply temporary hydro-seed to exposed and un-worked soils, according to the <br /> I approved construction plans, as needed to prevent erosion during site grading. <br /> Apply permanent hydro-seed to areas at final grade as site grading is completed. <br /> Apply mulching to exposed and un-worked soils, according to the approved <br /> I construction plans, as needed to prevent erosion during site grading. Maintain until <br /> site grading is completed and permanent hydro-seed is applied. <br /> Cover stockpiles with plastic sheeting, according to the approved construction <br /> I plans, as needed to prevent erosion during site grading. Maintain until stockpiles <br /> are removed from site. <br /> I Element#6—Protect Slopes <br /> N/A <br /> I Element#7—Protect Drain Inlets <br /> Use BMP C220 Storm Drain Inlet Protection. All storm drain inlets and culverts made <br /> operable during construction shall be protected to prevent unfiltered or untreated water <br /> I from entering the drainage conveyance system. However, the priority is to keep all access <br /> roads clean of sediment and keep street wash water separate from entering storm drains <br /> until treatment can be provided. <br /> IElement#8—Stabilize Channels and Outlets <br /> N/A <br /> IElement#9—Control Pollutants <br /> I <br /> I Insight Engineering Co. -Stormwater Site Plan 12/30/20 <br /> - 16- <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.