My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1523 CEDAR ST 2024-09-17
>
Address Records
>
CEDAR ST
>
1523
>
1523 CEDAR ST 2024-09-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2024 2:09:26 PM
Creation date
8/16/2024 11:36:16 AM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
1523
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERET'f WAC 296-46B-900: ELECTRICAL PLAN REVIEW <br /> w -INo*ox <br /> DIRECTIONS: Read the WAC section below to determine if plan review is req jjred or not required. Tnen select the box next;o (a) <br /> to tell City Staff if plan review is not requried and select the box next to the specif c reason from WAC 296-46B-900. If plan review <br /> is required. select the box next to (b) and (c)to acknowledge that plan review is required and the electrical plans have been <br /> provided with this permit application. <br /> * If item (a)-(ii, iii, or v) is selected, the work must also comply with section (a)-(vii). See arrow flow chart below. <br /> (3) Electrical plan review. <br /> ❑ (a) Electrical plan review is not required for <br /> ❑ (i) Low voltage systems <br /> �4 ❑ (ii) Lighting specific projects that result in an electrical load reduction on each feeder .nvolved in the project, <br /> (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> ♦ —❑ involved in the project. provided there is not a corresponding increase in the available fault current in any feeder. <br /> ❑ (iv) Stand-alone utility fed services that do not exceed 254 volts. 400 amperes where the project's distribution <br /> system does not include: <br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F): <br /> (B) An essential electrical system defined in NEC 517.2: or <br /> (C)A required fire pump system. <br /> -i (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A) Service or distribution equipment involved is rated not more than 400 amperes and does rot exceec <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F): <br /> (C) Does not involve branch circuits or feeders of an essential electrical system as defined in NEC: <br /> 517.2: and <br /> (D) Service or feeder load calculations are increased by 5% or less. <br /> (vi) Electric power production source(s)such as solar photovoltaic• fuel cell, or wind electric systems)with a total <br /> El <br /> rating of 9600 watts or less. <br /> (vii) For installations in (a)(ii), (iii), and (v) of this subsection to be considered, the following must be <br /> available to the electrical inspector before the work is initiated: <br /> (A) A clear and adequate description of the project's scope: <br /> (B) A load calculation(s): <br /> (C) What the load changes are, providing both before and after panel schedules as needed; and <br /> (D) Provide information showing that the service and feeder(s)supplying the panal(s) where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent <br /> protection for that supply. <br /> NOTE: Electrical plan review is not required "or"Medical. dental. and chiropractic clinic"of which is a clinic or <br /> ❑ physicians' office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> ❑ (b) Electrical plan review is required for all other new or altered electrical projects in educational. institutional. or health care <br /> occupancies defined in this chapter. <br /> ❑ (c) if a review is required• the electrical plan must be submitted for review and approval before the electrical work is begun <br /> Table 900.1 ,Table 900-2 <br /> Health or Personal Carr Facd:l:ea Educational Pad Irsdtutmnar Facilities Prates of Assembly or other=acilrties <br /> Health or Persona?care rac 11 ty Plan Review+ — -- " <br /> ' Edutatinnai, Institutacr:al.or Pian ReviewI <br /> Type Required <br /> other Facility Types Required <br /> Noteable <br /> S 900-' and 900.2. <br /> cam.! <br /> -'c.--- _. <br /> 'lEi:•,i•':I_C roc _.. Y,:. ' <br /> -....I:'F::r35•-:e ' s:":" "' PERMIT# Page 2-Plan Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.