My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Terracon Consultants, LLC 8/10/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Terracon Consultants, LLC 8/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 1:39:53 PM
Creation date
8/22/2024 1:39:14 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Terracon Consultants, LLC
Approval Date
8/10/2024
End Date
8/30/2024
Department
Facilities
Department Project Manager
Lolly Huggins
Subject / Project Title
Asbestos and Lead testing/ survey
Tracking Number
0004470
Total Compensation
$4,325.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Asbestos and Lead Inspection <br />Everett Parks and Facilities Department | Everett, Washington <br />July 2, 2024 | Terracon Proposal No. P81247400 <br />Facilities | Environmental | Geotechnical | Materials 1 <br /> <br /> <br /> <br />DETAILED SCOPE OF SERVICES <br />1.0 PROJECT INFORMATION <br />We understand that the Client is requesting an inspection for asbestos-containing materials <br />and lead-containing paints prior to future renovation. The inspection is limited to accessible <br />areas of the interior, exterior, and roofs of the buildings at the above referenced addresses <br />located in Everett, Washington (see attached Project Area Figure). The inspection does not <br />include equipment or supplies in the building that are not part of the building systems. <br />Terracon also understands that the intent of the inspection is to assist the Client with <br />communicating the presence of lead-containing paint and the presence, location, and <br />quantity of asbestos-containing material (ACM) to employees, vendors, and contractors <br />working in the buildings and to meet the requirements for an asbestos survey for the Puget <br />Sound Clean Air Agency (PSCAA) and a good faith inspection as required by Washington <br />State Department of Labor and Industries’ Division of Occupational Safety and Health <br />(DOSH) regulations prior to renovation. <br />This scope of work was developed with the assistance of the following documents and <br />individuals: <br /> Ms. Lolly Huggins, Capital Projects Coordinator, Everett Parks and Facilities <br />Department <br /> Forest Park As Built, Sheet 1, 12.16.2003 <br /> <br /> Legion Park Foundation Plan, Sheet 1, 1.24.1995 <br /> <br /> Thornton Sullivan Restroom Roof Replacement Draft, Sheet 1, 7.13.2004 <br /> <br />2.0 SCOPE OF SERVICES <br />2.1 Asbestos Inspection <br />Pursuant to the Client’s request, Terracon will perform an asbestos inspection of the three <br />restroom facilities identified herein. Terracon anticipates to collecting up to 75 samples for <br />this project. If additional samples are collected, Terracon will contact the Client for <br />authorization prior to incurring additional project costs. If authorized, additional samples will <br />be billed at $25.00 per sample. <br />The samples will be submitted and analyzed for asbestos content by polarized light <br />microscopy (PLM) by a laboratory accredited by the National Voluntary Laboratory <br />Accreditation Program (NVLAP) on a 5-Day turnaround time (TAT). Terracon may also <br />collect quality control asbestos bulk samples that will be submitted to an independent <br />laboratory for analysis. Some materials that are found to contain two percent or less than
The URL can be used to link to this page
Your browser does not support the video tag.