My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW FORMOST FUJI 2024-12-03
>
Address Records
>
80TH ST SW
>
905
>
FORMOST FUJI
>
905 80TH ST SW FORMOST FUJI 2024-12-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2024 8:57:56 AM
Creation date
8/27/2024 9:36:58 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
FORMOST FUJI
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2nd Floor <br />EV E R E T T <br />Everett, WA 98201 <br />everettwa.gov/permits <br />WASHINGTON <br />PermitServices@everettwa.gov <br />OWNER NAME AND ADDRESS: <br />FFC-PACK LLC <br />19211- 144TH AVE NE <br />WOODINVILLE, WA 98072 <br />PHONE: 4254839090 <br />Date Applied: 4/5/2023 <br />Public Works Permit #: PW2304-005 <br />Associated Bldg Permit #: B2304-010 <br />Planning Reference #: <br />Public Works Fee: $2,995.18 <br />Schedule Inspections at: onlinepermits.everettwa.gov <br />APPLICANT NAME AND ADDRESS: <br />WILL SEMPLE <br />PHONE: 4256567462 <br />SITE ADDRESS: 905 80TH ST SW TAX PARCEL ID #: 28041200306000 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: CONST OF 11,057 SF BLDG EXPANSION/ ACCESSIBLE PARKING RELOC/ <br />NOTES: SIDEWALK IMPROVEMENTS/ UTILITY RELOCATE/IMPROVEMENTS-STORM WATER RUNOFF <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov. Available inspection dates are shown in the dropdown <br />menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and <br />Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site at all <br />times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br />request all required inspections. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on -site <br />in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the improvements <br />located therein. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained from <br />the City's Traffic Engineering Division. This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic control plan <br />to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />12. A recorded Declaration of Covenant for Inspection and Maintenance of Onsite Stormwater BMPs shall be submitted to the City prior to final <br />approval/close out of the permit. <br />13. A 2-year Warranty Bond in the amount of 10% of the construction costs for all Stormwater Infrastructure shall be submitted to the City prior <br />to final approval/close out of the permit. <br />14. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. To schedule a planning <br />inspection, contact Planning@everettwa.gov and request an inspection with the permit number, site address, and inspection type listed. <br />Please allow up to one week for the inspection to be scheduled. <br />15. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br />PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br />completed. <br />16. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of the <br />right-of-way for municipal purposes. <br />Page 1 of 2 <br />_APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.