Laserfiche WebLink
PUBLIC WORKS PERMIT <br />Date Applied: 4/5/2023 <br />City of Everett Permit Services <br />3200 Cedar Street, 2"d Floor <br />EV E R E T T <br />Everett, WA 98201 <br />everettwa.gov/permits <br />WASHINGTON <br />Perm itServices(@everettwa.eov <br />Public Works Permit #: PW2304-005 <br />Associated Bldg Permit #: B2304-010 <br />Planning Reference #: <br />Public Works Fee: $2,995.18 <br />Schedule Inspections at: onlinepermits.everettwa.gov <br />17. Dewatering water shall be continuously monitored for hydrocarbons during dewatering operations. Contaminated dewatering water shal <br />not be discharged to the surface. The contractor shall stage Baker Tanks onsite for storage of contaminated dewatering water. If <br />hydrocarbons are encountered, immediately contact Ecology and the City to determine proper disposal. Disposal may include hauling the <br />contaminated water offsite. If sewer discharge is allowed, a preauthorization permit from the City is required. <br />PERMIT FEE BREAKDOWN: <br />Erosion Control.......................................................$200.00 <br />Grade/Fill/Excavate (300 CY)....................................$90.00 <br />Paving (6,178 SF).......................................................$45.00 <br />PW Plan Review......................................................$335.24 <br />PW Site Inspection..................................................$670.47 <br />Stormwater System Development Fee (6,178 SF)$1,654.47 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and <br />all claims for damages, costs, expenses, or causes of action that may arise because of installation and maintenance of the improvement or other <br />right-of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged <br />thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. <br />This permit may be canceled by the city upon any stoppage of work on this project over 180-day duration. Each inspection extends the expiration <br />date 180 days to keep the permit open while work is active. <br />Page 2 of 2 <br />-APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />