My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8531 EVERGREEN WAY COMMUNITY HEALTH CENTER 2025-05-28
>
Address Records
>
EVERGREEN WAY
>
8531
>
COMMUNITY HEALTH CENTER
>
8531 EVERGREEN WAY COMMUNITY HEALTH CENTER 2025-05-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 1:23:07 PM
Creation date
8/27/2024 11:52:36 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8531
Tenant Name
COMMUNITY HEALTH CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
644
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 2/22/2023 <br />City of Everett Permit Services Public Works Permit #: PW2302-011 <br />3200 Cedar Street, 2nd Floor Associated Bldg Permit#: B2302-096 <br />EV E R E T T Everett, WA 98201 Planning Reference #: REVI23-018 <br />everettwa.gov/permits Public Works Fee: $4,247.44 <br />WASHINGTON Perm itSeryices@eyerettwa.goy Schedule Inspections at: onlinepermits.everettwa.gov <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />COMMUNITY HEALTH CENTER OF SNOHOMISH CO JANET L. MONDA <br />PO BOX 13060 <br />EVERETT, WA 98206 <br />PHONE: PHONE: 4258232244 <br />SITE ADDRESS: 8531 EVERGREEN WAY TAX PARCEL ID #: 28041300103100 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: SITE WORK FOR CHC - CLEARING, GRADING, PARKING, LANDSCAPING <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov. Available inspection dates are shown in the dropdown <br />menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and <br />Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site at <br />all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br />request all required inspections. A handout is provided at permit issuance with instructions on how to request an inspection online. <br />6. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />7. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense. This work to be <br />under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department. Work shall be <br />scheduled 3-4 weeks in advance. <br />8. As-builts of water, sanitary sewer, and storm systems are required to be submitted to the PW Inspector per City "Design and Construction <br />Standards and Specifications for Development" prior to the utilities being brought online. Water, sewer, and storm as-builts may be <br />submitted separately as they become available. Water as-builts MUST be submitted prior to the Water Department making connection to <br />the public water system and putting the new water main in service. It is encouraged for the water system to be surveyed prior to cover. <br />9. Record Pedestrian Access Easement. The easement documentation must be recorded by the project team with a copy of the recorded <br />document submitted to the City prior to final approval/close out of the permit. <br />10. A Declaration of Covenant for Stormwater BMPs shall be submitted to the City prior to final approval/close out of the permit. <br />11. A 1-year Warranty Bond in the amount of 10% of the construction costs for all public improvements shall be submitted to the City prior to <br />final approval/close out of the permit. <br />12. A 2-year Warranty Bond in the amount of 10% of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br />prior to final approval/close out of the permit. <br />13. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. To schedule a planning <br />inspection, contact Planning@everettwa.gov and request an inspection with the permit number, site address, and inspection type listed. <br />Please allow up to one week for the inspection to be scheduled. <br />14. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained <br />from the City's Traffic Engineering Division. This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br />control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />15. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br />PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for this <br />permit. <br />Page 1 of 2 <br />_APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.