Laserfiche WebLink
PUBLIC WORKS PERMIT <br />Date Applied: 2/22/2023 <br />City of Everett Permit Services <br />3200 Cedar Street, 2"d Floor <br />EV E R E T T <br />Everett, WA 98201 <br />everettwa.gov/permits <br />WASHINGTON <br />Perm itServices(@everettwa.eov <br />PERMIT FEE BREAKDOWN: <br />Erosion Control....................................................................$200.00 <br />Grade/Fill/Excavate (155 CY)..................................................$70.00 <br />Paving (5,552 SF)....................................................................$45.00 <br />PW Plan Review...................................................................$423.53 <br />PW Site Inspection...............................................................$847.05 <br />Stormwater System Development Fee (9,908 SF).............$2,661.86 <br />Public Works Permit #: PW2302-011 <br />Associated Bldg Permit #: B2302-096 <br />Planning Reference #: REV123-018 <br />Public Works Fee: $4,247.44 <br />Schedule Inspections at: onlinepermits.everettwa.gov <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and <br />all claims for damages, costs, expenses, or causes of action that may arise because of installation and maintenance of the improvement or other <br />right-of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged <br />thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. <br />This permit may be canceled by the city upon any stoppage of work on this project over 180-day duration. Each inspection extends the expiration <br />date 180 days to keep the permit open while work is active. <br />Page 2 of 2 <br />APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />