My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8531 EVERGREEN WAY COMMUNITY HEALTH CENTER 2025-05-28
>
Address Records
>
EVERGREEN WAY
>
8531
>
COMMUNITY HEALTH CENTER
>
8531 EVERGREEN WAY COMMUNITY HEALTH CENTER 2025-05-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 1:23:07 PM
Creation date
8/27/2024 11:52:36 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8531
Tenant Name
COMMUNITY HEALTH CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
644
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
x< <br />am� <br />am„ <br />yc <br />00 c <br />N U)n <br />N D< <br />Ov <br />w v m <br />o CL <br />N G1 <br />cn N <br />D G <br />L <br />f <br />/ <br />/ <br />/2 USE EX DRIVE FOR <br />/ CONSTRUCTION ENTRANCE <br />/ <br />❑5 COVER STOCKPILE � <br />3 <br />CATCH BASIN <br />PROTECTION TYP ' <br />i�4 ❑3 <br />;EDIMENT TRAP <br />234 SF SURFACE AREA _ <br />/ CONTRACTOR TO PLACE <br />/ SEDIMENT COLLECTION LOW <br />POINT WHERE IT FITS BES <br />DISCHARGE TO EX CATC BASIN <br />�p. /[ APPLY SOIL 1 <br />` AMENDMENT IN 13 <br />LANDSCAPED AREAS C2.1 <br />k <br />PROTECT IN PLACE EX ASPHALT <br />1,6 <br />TEMPORARY ` <br />INTERCEPTOR SWA` \ \� <br />\� s PROPERTY LINE <br />��`` <br />C2.1 <br />s _ <br />TT —---- <br />PROPOSED BUILDING I <br />3 <br />C2.1 �---- <br />COMPOST <br />/ ❑ LIMIT OF ❑4 SOCK ' <br />/ DISTURBANCE TYP ` <br />O / <br />i <br />i <br />LEGEND: <br />ri <br />LIMIT OF DISTURBANCE <br />\ / <br />— — <br />PROPERTY LINE <br />/ <br />COMPOST SOCK <br />INLET PROTECTION <br />i <br />EXISTING CONTOURS <br />❑X <br />BMP ELEMENT <br />'i 20 10 0 20 40 i <br />� \ / <br />—X—X—X—X— <br />HIGH VISIBILITY FENCING <br />SCALE IN FEET <br />n <br />EROSION AND SEDIMENT CONTROL NOTES: <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) <br />PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD <br />OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, <br />PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTIUTIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE <br />CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF <br />THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />APPUCANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED <br />AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN <br />SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO <br />CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO <br />DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE <br />PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE <br />APPUCANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE <br />CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING <br />ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT <br />SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE <br />DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER <br />QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE <br />UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO <br />ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT <br />LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND <br />MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR <br />CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND <br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 <br />HOURS FOLLOWING A MAJOR STORM EVENT. <br />B. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE <br />ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL <br />CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED <br />PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH <br />SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />EROSION AND SEDIMENT CONTROL BMPS: <br />❑1 ELEMENT #1: PRESERVE VEGETATION/MARK CLEARING LIMITS <br />BMP C103 HIGH VISIBILITY PLASTIC OR METAL FENCE <br />❑2 ELEMENT #2: ESTABLISH CONSTRUCTION ACCESS: <br />BMP C106 WHEEL WASH <br />❑3 ELEMENT #3: CONTROL FLOW RATES: <br />BMP C240 SEDIMENT TRAP <br />❑4 ELEMENT #4: INSTALL SEDIMENT CONTROLS <br />BMP C235 WATTLES <br />BMP C240 SEDIMENT TRAP <br />❑5 ELEMENT #5: STABILIZED SOILS <br />BMP C123 PLASTIC COVERING <br />BMP C125 TOPSOIUNG/COMPOSTING <br />BMP C140 DUST CONTROL <br />❑6 ELEMENT #6: PROTECT SOILS <br />NOT APPLICABLE TO THIS PROJECT <br />7❑ ELEMENT #7: PROTECT DRAIN INLETS <br />BMP C220 STORM DRAIN INLET PROTECTION <br />❑8 ELEMENT #8: STABILIZE CHANNELS AND OUTLETS <br />NOT APPLICABLE TO THIS PROJECT <br />❑9 ELEMENT #9: CONTROL POLLUTANTS <br />BMP C151 CONCRETE HANDLING <br />BMP C152 SAWCUTTING AND SURFACING POLLUTION PREVENTION <br />BMP C154 CONCRETE WASHOUT AREA <br />BMP C252 HIGH PH NEUTRALIZATION USING CO2 <br />BMP C253 PH CONTROL FOR HIGH PH WATER <br />10 ELEMENT #10: CONTROL DETWATERING <br />NOT APPLICABLE TO THIS PROJECT <br />E11 ELEMENT #11: MAINTAIN BMPS <br />BMP C150 MATERIALS ON HAND <br />12 ELEMENT #12: MANAGE THE PROJECT <br />BMP C150 MATERIALS ON HAND <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT 13 ELEMENT #13: PROTECT LOW IMPACT DEVELOPMENT <br />THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE BMP C103 HIGH VISIBILITY PLASTIC OR METAL FENCE <br />DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE <br />REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN <br />FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO <br />REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT <br />FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS <br />FAIL. IF BMPS FAIL AND SEDIMENT -LADEN WATER IS LEAVING THE <br />SITE, IMMEDIATELY NOTIFY YOUR PUBLIC WORKS INSPECTOR. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED <br />AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM <br />OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 <br />DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />13. NOTIFY THE CITY PUBLIC WORKS INSPECTOR AT LEAST 24 HOURS <br />PRIOR TO DEWATERING ACTIVITIES. HANDLE HIGHLY TURBID OR <br />OTHERWISE CONTAMINATED DEWATERING WATER SEPARATELY FROM <br />STORMWATER. <br />14. THE APPROVED PROJECT PUBLIC WORKS PERMIT AND SWPPP <br />' SHALL BE RETAINEDON SITE OR READILY AVAILABLE TO THE <br />CONTRACTOR THROUGHOUT THE DURATION OF THE CONSTRUCTION <br />PROJECT. <br />15. DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN EFFECTIVE POLLUTION <br />PREVENTION MEASURES TO MINIMIZE THE DISCHARGE OF <br />POLLUTANTS. <br />o <br />16. PROTECT ALL LID BMPS FROM SEDIMENTATION THROUGH <br />INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENT <br />LArAwAffAw <br />CAUTION <br />om <br />CONTROL BMPS ON PORTIONS OF THE SITE THAT DRAIN INTO THE <br />LID BMPS. <br />UNDERGROUND UTRIIF <br />Kn whmrsbl101R <br />cWhdafd IIWft <br />CONV <br />TRACTOR TO VERIFY <br />EXACT LOCATION AND DEPTH <br />O y HIT H Oflwl , RB HDP TFD <br />�PORq 'm �R�,4, BUSH, ROED & HITCHINGS, INC. TESC PLAN AND NOTES y,O1e / <br />N _ °° Fc" 5 4L` LAND SURVEYORS & CIVIL ENGINEERS CHIC ADMIN EXPANSION AS SHOWN 08/18/23 <br />SEAL <br />n •� vi` R 9eu24 3 PUBLIC WORKS COMMENTS 8/18/23 15400 BE 30TH PL, STE 100 (206) 323-4144 2022034 <br />a Agswl � ��esy'ONA� gacJ z PUBLIC WORKS COMMENTS 7/07/23 BRN 98007- 54 Washington 1-800-935-05 M <br />x I arr coMMBNrs a/la/z3 98007-6546 WWW.BRHINO.COM <br />EVERETT SNOHOMISH COUNTY WASHINGTON C2 0 <br />V NO REVISION DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.