My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
True North Consulting Group LLC 8/26/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
True North Consulting Group LLC 8/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 1:42:48 PM
Creation date
8/28/2024 1:38:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
True North Consulting Group LLC
Approval Date
8/26/2024
End Date
8/31/2026
Department
Procurement
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Everett Transit Security Threat Assessment
Tracking Number
0004488
Total Compensation
$108,075.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />sales@tncg.com CONSULTING MADE PERSONAL PAGE 29 OF 57 <br /> <br />Phase II – Security Systems Analysis and Physical On-Site Threat and <br />Vulnerability Assessment <br />We assess security risk based on threat, consequences of loss/negative <br />impact to most critical assets, and identified vulnerability in all three <br />domains of security (technology, physical measures/design/layout, and <br />human factor/operations/protocol/training and procedures). Our <br />recommendations are prioritized by their ability to reduce the most critical <br />risk across the entire organization. We have developed our proprietary, multi- <br />phased methodology for information gathering, risk analysis, and reporting <br />to provide clients with the best possible end product. <br /> <br /> <br />TASK 1 - Determine the level of implementation of recommendations for <br />each item within the project scope and develop a gap analysis <br />between recommendations and implementation of mitigation <br />efforts. Identify equipment and operational changes to increase <br />efficiency and provide necessary improvements. Make preliminary <br />recommendations based on findings, risk, and best practices for <br />all areas of the City of Everett. <br />Asset <br />Analysis <br />•Occurs prior to <br />and during on- <br />site <br />assessment. <br />•Identification <br />of <br />organizational <br />assets. <br />•Rating of assets <br />based on <br />potential <br />consequence of <br />loss. <br />Threat <br />Assessment <br />•Occurs prior to <br />and during on- <br />site <br />assessment. <br />•Definition of <br />target profile. <br />•Identification <br />of relevant PTE <br />motivations. <br />•Review of <br />security <br />incidents <br />targeting <br />similar sites. <br />•Identification <br />and rating of <br />relevant PMAs <br />based on <br />probability and <br />consequence. <br />Vulnerability <br />Assessment <br />•Occurs prior to, <br />during, and <br />after on-site <br />assessment. <br />•Review of <br />physical and <br />technological <br />security <br />measures, <br />security <br />staffing, and <br />security <br />protocols. <br />•Analysis of <br />current levels <br />of protection <br />for high-value <br />assets against <br />relevant PMAs. <br />Risk <br />Assessment <br />•Occurs after <br />on-site <br />assessment. <br />•Analysis of <br />probability and <br />consequence <br />for relevant <br />PMAs based on <br />current security <br />program. <br />Recommendations <br />•Occurs after <br />on-site <br />assessment. <br />•Recommended <br />actions <br />addressing <br />physical, <br />technological, <br />and human <br />security <br />measures. <br />•Designed to <br />reduce or <br />eliminate the <br />probability and <br />consequence of <br />relevant PMAs.
The URL can be used to link to this page
Your browser does not support the video tag.