My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 21 13-1 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 SECTION 00 21 13 INSTRUCTIONS TO BIDDERS 1-00 INTRODUCTORY MATTERS General Description and Location of Project The Work to be performed will include furnishing all labor, materials and equipment necessary to perform all Work as required by the Contract in accordance with the Contract Documents. The Project is located at 6133 Lake Chaplain Road, Monroe, WA 98272. Project Manager Questions and inquiries about these Contract Documents should be directed in writing to the attention of John Nottingham, PE, jnottingham@everettwa.gov. Standard Specifications The following other Specifications and Standard Plans shall apply only to the extent that they are called out in the Contract Documents. • WSDOT “Standard Specifications for Road, Bridge and Municipal Construction”, hereinafter referred to as the “Standard Specifications, latest edition.” • City of Everett “Design and Construction Standards and Specifications” (Revised January 2018), as found online on the City’s Website at: https://everettwa.gov/1531/Design-Construction-Standards • “Standard Plans for Road and Bridge Construction,” latest edition as prepared by WSDOT. • “Manual on Uniform Traffic Control Devices” (MUTCD), latest edition. • APWA Standards, latest edition. • AWWA Standards, latest edition. • American Concrete Institute (ACI), latest edition. 1-01 DEFINITIONS AND TERMS 1-01.3 Definitions Definitions are found in SECTION 00 72 00 - GENERAL CONDITIONS. 1-02 BID PROCEDURES AND CONDITIONS 1-02.1 Bidder Responsibility Criteria 1-02.1(1) Mandatory Bidder Responsibility Criteria Bidder shall meet mandatory responsibility criteria in accordance with RCW 39.04.350(1). The City may require Bidder to submit documentation demonstrating compliance with the criteria under this 1-02.1(1). Bidder must: 1. Registration. At the time of bid submittal, have a certificate of registration in compliance with chapter 18.27 RCW, a plumbing contractor license in compliance
The URL can be used to link to this page
Your browser does not support the video tag.