Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-48 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />vii. Other categories as specified by the Contractor or the Owner. <br />10. A notarized statement shall be submitted to the Owner's Representative containing the <br />following language: <br />Under the penalty of law for perjury or falsification, the undersigned, <br /> <br />______________________________, ______________________________ <br /> (name) (title) <br />of ____________________________________________________________ <br /> (company) <br />hereby certifies that the Contract Claim for an adjustment to the Contract Sum <br />and/or Contract Time, if any, made herein for Work on this Contract is a true and <br />complete statement of the factual basis of the Contract Claim and all actual costs <br />incurred and time sought, and is fully documented and supported under the <br />Contract between the parties. <br />Date________________________________/s/ _______________________ <br />Subscribed and sworn before me this ____________ day of _______ <br />Notary Public <br />My Commission Expires: ___________________________________________ <br />12.3 FALSE OR OMITTED INFORMATION <br />The Contractor waives each Contract Claim for which it presents material information that it <br />knows, or in the exercise of reasonable care should know, is false, or omits or fails to disclose <br />material information relating to such Contract Claim. In such case, Contractor shall reimburse <br />the Owner for any and all fees and expenses incurred in investigating any such Contract Claim. <br />12.4 REMEDIES <br />12.4.1 General <br />If a Contract Claim has merit in whole or in part, then Contractor’s sole remedies shall be those <br />provided in this subsection. Contractor must timely and strictly comply with the requirements of <br />10. NOTICE TO OWNER, 11. DIFFERING SITE CONDITIONS, 12. CONTRACT CLAIMS and <br />all other General Conditions relating to the Contract Claim. Adjustments to Contract Time shall <br />be determined pursuant to 5.2.2.2 Extensions of Contract Time. Failure to comply strictly and <br />timely shall be deemed a waiver of the Contract Claim. <br />12.4.2 Extra Work <br />12.4.2.1 Adjustment of Contract Sum <br />If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work, the <br />adjustment shall be calculated and paid as provided in 9.5. ADJUSTMENT OF CONTRACT <br />SUM. This amount includes jobsite and home office Overheads for such Work, including any <br />schedule delays relating to such Work. Therefore, no compensation in addition to that provided <br />in 9.6. FORCE ACCOUNT shall be paid for such things as extended Overhead or other costs or <br />damages. <br />12.4.2.2 Extension of Contract Time <br />Extensions of Contract Time caused by Extra Work shall be determined as provided in 5.2.2.2 <br />Extensions of Contract Time.