IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-48 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />vii. Other categories as specified by the Contractor or the Owner. <br />10. A notarized statement shall be submitted to the Owner's Representative containing the <br />following language: <br />Under the penalty of law for perjury or falsification, the undersigned, <br /> <br />______________________________, ______________________________ <br /> (name) (title) <br />of ____________________________________________________________ <br /> (company) <br />hereby certifies that the Contract Claim for an adjustment to the Contract Sum <br />and/or Contract Time, if any, made herein for Work on this Contract is a true and <br />complete statement of the factual basis of the Contract Claim and all actual costs <br />incurred and time sought, and is fully documented and supported under the <br />Contract between the parties. <br />Date________________________________/s/ _______________________ <br />Subscribed and sworn before me this ____________ day of _______ <br />Notary Public <br />My Commission Expires: ___________________________________________ <br />12.3 FALSE OR OMITTED INFORMATION <br />The Contractor waives each Contract Claim for which it presents material information that it <br />knows, or in the exercise of reasonable care should know, is false, or omits or fails to disclose <br />material information relating to such Contract Claim. In such case, Contractor shall reimburse <br />the Owner for any and all fees and expenses incurred in investigating any such Contract Claim. <br />12.4 REMEDIES <br />12.4.1 General <br />If a Contract Claim has merit in whole or in part, then Contractor’s sole remedies shall be those <br />provided in this subsection. Contractor must timely and strictly comply with the requirements of <br />10. NOTICE TO OWNER, 11. DIFFERING SITE CONDITIONS, 12. CONTRACT CLAIMS and <br />all other General Conditions relating to the Contract Claim. Adjustments to Contract Time shall <br />be determined pursuant to 5.2.2.2 Extensions of Contract Time. Failure to comply strictly and <br />timely shall be deemed a waiver of the Contract Claim. <br />12.4.2 Extra Work <br />12.4.2.1 Adjustment of Contract Sum <br />If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work, the <br />adjustment shall be calculated and paid as provided in 9.5. ADJUSTMENT OF CONTRACT <br />SUM. This amount includes jobsite and home office Overheads for such Work, including any <br />schedule delays relating to such Work. Therefore, no compensation in addition to that provided <br />in 9.6. FORCE ACCOUNT shall be paid for such things as extended Overhead or other costs or <br />damages. <br />12.4.2.2 Extension of Contract Time <br />Extensions of Contract Time caused by Extra Work shall be determined as provided in 5.2.2.2 <br />Extensions of Contract Time.