IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-49 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />12.4.3 Delays <br />12.4.3. Owner Caused Delay Unrelated to Extra Work <br />12.4.3.1.1 Adjustment of Contract Sum <br />If the Contractor is entitled to an adjustment of Contract Sum because of a Delay solely <br />caused by the Owner that does not relate to Extra Work, Contractor shall only be <br />compensated for the items below, less all funds paid pursuant to any change in the Contract <br />Sum that contributed to the Delay: <br />1. Documented, incurred cost of nonproductive field supervision or labor extended because <br />of the Delay; <br />2. Documented, incurred cost of home office supervision to attend jobsite meetings; <br />3. Documented, incurred cost of temporary facilities or equipment rental extended because <br />of the Delay; <br />4. Documented, incurred cost of insurance extended because of the Delay; <br />5. General and administrative Overhead in an amount to be agreed upon, but not to <br />exceed three percent (3%) of original Contract Sum divided by the Contract Time for <br />each day of the Delay. <br />Owner shall not owe Contractor compensation for extended Overhead or other delay costs <br />to the extent Contractor or anyone other than the City contributed to or is concurrently <br />responsible for the Delay. <br />12.4.3.1.2 Adjustment of Contract Time <br />If the Contractor is entitled to an adjustment of Contract Time because of a Delay solely <br />caused by the Owner that does not relate to Extra Work, Contractor shall be entitled to an <br />adjustment of Contract Time to the extent the Delay increases the duration of the Project, as <br />measured by the critical path and as demonstrated pursuant to the requirements of 5.2.2.2 <br />Extensions of Contract Time. <br />12.4.3.2 Contractor Caused Delay <br />If the Contractor is solely responsible for any Delay to any interim milestone, Substantial <br />Completion, Physical Completion or the Completion Date, the Owner shall be entitled to <br />liquidated or other damages as provided elsewhere in the Contract Documents. The Contractor <br />accepts the risk of any Delays caused by strikes, work slowdowns, job actions and labor unrest <br />of any kind. Contractor shall not be entitled to any increase in Contract Sum or Contract Time <br />due to a Delay it caused. <br />12.4.3.3 Delays Concurrently Caused by Contractor and Owner <br />If the Owner and the Contractor cause a Delay concurrently, neither the Owner nor the <br />Contractor shall be liable to the other except as provided herein. <br />12.4.3.3.1 Adjustment of Contract Sum <br />The Contractor shall not be entitled to any adjustment in Contract Sum for Delays <br />concurrently caused by the Owner and the Contractor. <br />12.4.3.3.2 Adjustment of Contract Time <br />The Contractor shall be entitled to an extension of Contract Time for the Owner caused <br />portion of any Delay concurrently caused by the Owner and Contractor to the extent the <br />Owner caused the Delay to extend longer than if the Contractor had solely caused the <br />Delay.