IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 11 00-1 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 SECTION 01 11 00 SUMMARY OF WORK PART 1 : GENERAL 1.01 SUMMARY A. The Work specified for this contract consists of furnishing all labor, materials, tools, and equipment necessary for the construction and installation of new and existing air blowers, compressor, and electrical and control equipment in a new pre-engineered metal building. The work generally includes, but shall not be limited to the following: 1. Construct a pre-engineered metal building to house two (2) air blowers, an air compressor, dry-type transformer, control panel, two (2) variable frequency drives (VFDs), and a panelboard. The building size is approximately 24’x 30’ (interior dimensions), with an 18-foot wide by 12-foot-high rollup door and a single 36-inch door. An on-grade concrete foundation will support the building. The new building is approximately 5 feet from the existing blower building. 2. Install a new air blower and relocate the existing air blower from the current blower building to the new blower building. The blowers are variable speed units with 200 HP motors, and with a capacity of approximately 3,825 standard cubic feet per minute. The new blower has been sized and selected by the City. Connect the air blower piping from the blowers to the air piping outside the main Water Filtration Plant (WFP) building. 3. Install a new duplex instrumentation-grade air compressor system to provide redundancy with the existing compressor unit located inside the main WFP building. This compressor system provides instrumentation-grade air for the pneumatic valve actuators used to regulate the filter plant operations. The compressor unit will be purchased by the City and will be delivered prior to construction for installation by the Contractor. The compressor system package includes two (2) compressor units, air receiver, pressure regulator, compressor controls, filtration, drying system, and oil mist eliminator with a nominal rated output pressure of 125 pounds per square inch (psi). The new compressed air piping from the compressor connects with the existing piping inside the main WFP building. 4. Install a new motor control center (MCC) with a 480-volt panel and individually mounted VFDs. 5. Transfer the existing blower control panel from the current blower building to the new blower building. 6. Transfer the existing fiber optic termination cabinet from the current blower building to the new blower building and install new fiber optic cables. 7. Provide electrical service to the new building by connecting to an existing transformer near the building.