Laserfiche WebLink
Section 01 11 00 SUMMARY OF WORK City of Everett 01 11 00-4 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 thereto in effect on the date of Invitation for Bids, except as limited to type, class or grade, or modified in such references. All work shall conform to the standard referred to, except as modified in these specifications and the Drawings. 1.10 CHECKING DRAWINGS AND SPECIFICATIONS A. Prior Submission of Bids: The Contractor shall report any discrepancies or omissions in the Drawings and/or specifications to the Engineer for a decision prior to the Submission of Bids. B. Resolution of Conflicts: Where there is conflict between the Drawings and the specifications in regard to materials, equipment, sizes, numbers or locations, the Owner shall be the sole judge in resolving the conflict. PART 2 : PRODUCTS Not Used. PART 3 : EXECUTION Not Used. END OF SECTION 01 11 00