My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 01 11 00 SUMMARY OF WORK City of Everett 01 11 00-3 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 and coordination with the City's Project Manager. 1.05 WORK SEQUENCE A. Work in stages in order to accommodate the City's use requirements during the construction period. Coordinate construction schedule and operations with the City. 1.06 PERMITS A. The Contractor shall be responsible to obtain and pay the cost of any applicable permits required to do the Work, and such costs shall be included in their Bid. 1.07 WORK BY OTHERS A. The Contractor is required to coordinate all their activities with the City’s Project Manager, or his/her designee. The City will have other construction projects in progress at the Water Filtration Plant site during the duration of this project and it is the Contractor’s responsibility to assure that adequate notice is given to the City’s Project Manager regarding equipment or materials that may need to be relocated in order to perform the work. 1.08 WORK BY THE OWNER A. The City shall have the right to access the site 24/7 and execute work not included in this Contract and concurrent with the contract period. The Contractor shall cooperate with such City sponsored efforts. B. The Contractor shall coordinate with the City in scheduling operations to minimize conflict with concurrent construction projects, plant operations and maintenance activities. 1.09 CODES AND STANDARD SPECIFICATIONS A. All construction shall be in accordance with the International Building Code, Current Adopted Edition. B. All construction shall be in accordance with the Uniform Mechanical Code, and the Uniform Plumbing Code, latest editions. C. All construction shall be in conformance with the WSDOT/APWA Standard Specifications and Standard Plans, latest editions. D. All construction shall be in conformance with the City of Everett Design and Construction Standards and Specifications, latest edition. E. All work shall comply with applicable requirements of Snohomish County. F. Any material specified by reference to the number, symbol, or title of a specified standards, such as Commercial Standard Federal Specifications, a trade association standard, or other similar standard, shall comply with the requirements of the latest revision thereof, and any amendment or supplement
The URL can be used to link to this page
Your browser does not support the video tag.