IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 01 22 20 MEASUREMENT AND PAYMENT City of Everett 01 22 20-9 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 • Installation of plumbing, water, drainage and process mechanical piping and appurtenances that involve slab penetrations or are to be buried beneath and within the confines of the building foundation • Delivery, placing, finishing and quality control of concrete materials and any other items necessary to complete the Work in conformance with the Contract Documents • Design, fabrication, and installation of a complete pre-engineered metal building, including insulation and overhead and single doors, with specified locking systems • Adjustment and testing to verify satisfactory operational functions of the building structure, including access and weatherproofing; and any other items necessary to complete the Work in conformance with the Contract Documents. The cost to haul and furnish CSBC material shall be included in Bid Item “Crushed Surfacing Top and Base Course.” Bid Item 7. Centrifugal Blower Installation Measurement and Payment: Lump Sum The lump sum (LS) Contract Price for “Centrifugal Blower Installation” shall constitute full compensation for all labor, materials, tools and equipment necessary and incidental to install the City furnished new blower and to remove and relocate the existing blower from the existing building to the new blower building. Work shall include but not limited to, installation of the two blower skids with owner-furnished vibration pads onto equipment pads in accordance with manufacturer’s recommendations and as shown on the Drawings and as described in the Specifications. Piping, valves, intake filter assemblies, and discharge silencer assemblies associated with these blowers shall be provided as part of Bid Item “Mechanical Piping, Valves, and Appurtenances”. Bid Item 8. Duplex Air Compressor Installation Measurement and Payment: Lump Sum The lump sum (LS) Contract Price for “Duplex Air Compressor Installation “shall constitute full compensation for all labor, materials, tools and equipment necessary and incidental to install the City furnished duplex air compressor skid. Work shall include but not limited to, installation of the duplex air compressor skid in accordance with manufacturer’s recommendations and as shown on the Drawings and as described in the Specifications. Piping, valves, and appurtenances associated with compressed air system shall be provided as part of Bid Item “Mechanical Piping, Valves, and Appurtenances”. Bid Item 9. Mechanical Piping, Valves, and Appurtenances Measurement and Payment: Lump Sum The lump sum (LS) bid price for “Mechanical Piping, Valves, and Appurtenances” shall constitute full compensation for all work, labor, materials, tools, equipment, and incidentals necessary to furnish and install or install owner-furnished equipment, including all mechanical piping, valves,