Laserfiche WebLink
Section 01 22 20 MEASUREMENT AND PAYMENT City of Everett 01 22 20-10 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 and appurtenances as shown on the Drawings and specified in the Specifications. The bid price shall include but not be limited to furnishing and installing or installing owner-furnished expansion joints, piping, spools, fittings, couplings, valves, gaskets, appurtenances, pressure gauges, intake filter assemblies, blower discharge silencers, connections to existing pipes, and pipe and equipment supports associated with the two centrifugal blowers and the duplex air compressor as shown on the Drawings and as described in the Specifications. Bid Item 10. Building HVAC Measurement and Payment: Lump Sum The lump sum bid item for “Building HVAC” shall constitute full compensation for all labor, materials, tools, and equipment necessary and incidental to furnish and install HVAC work in the new blower building. Work shall include, but not be limited to HVAC permits and inspection fees, exhaust fans, louvers, grilles, supports, isolators, test and balance, all requirements as shown on the Drawings and as described in Division 23, HVAC. Bid Item 11. Drain Piping Measurement and Payment: Lump Sum The lump sum (LS) bid price for “Drain Piping” shall constitute full compensation for all work, labor, materials, tools, equipment, and incidentals necessary to furnish and install all site drain piping, and appurtenances as shown on the Drawings and specified in the Specifications. The bid price shall include but not be limited to saw cutting existing pavement; excavation, removal, haul, and disposal of excavated native and waste material including existing pipes and structures in the excavation; furnishing and installing all piping, fittings, and appurtenances; connection to roof downspouts, building floor drain, and existing drain piping including fittings, spools and couplings; pipe zone bedding materials and placement, imported backfill materials and placement, hauling, and compaction associated with the site drain piping as shown on the Drawings and as described in the Specifications. Bid Item 12. Crushed Surfacing Top and Base Course Measurement and Payment: Ton Measurement for crushed surfacing top and base course will be by the ton as recorded on certified weight tickets and limited to dimensions defined in the Work, descriptions for other bid items, shown on the Drawings, details or COE Standard Drawings or as otherwise approved by the Engineer. Crushed Surfacing Top and Base Course material placed exceeding “neatline” quantities without advance authorization by the Inspector will not be paid for. The unit Contract Price per ton (TN) for “Crushed Surfacing Top and Base Course” shall be full compensation for all Work, labor, material, tools, and equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed surfacing top and base course for the Work as required, from a Contractor supplied source. The unit price for crushed surfacing top and base course also includes all costs for controlling moisture content.