Laserfiche WebLink
Section 01 29 73 SCHEDULE OF VALUES <br /> <br />City of Everett 01 29 73-2 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />4. List of principal suppliers and fabricators. <br />5. Schedule of submittals and list of products. <br />C. Use as basis for determining dollar value amount for each work activity and <br />component of work for duration of Project. <br />D. Make Schedule of Values total sum equal to current Contract sum. <br />E. Round-off figures to nearest dollar amount. <br />F. Identify Schedule of Value line items by corresponding Section Titles in Project <br />Manual Table of Contents. <br />G. Break down major portion of work by areas, disciplines, phase, systems, or as <br />appropriate for ease of review. <br />H. For work that exceeds 1.0 percent of Contract Sum, break out separate line <br />items according to major work activities, components, products, or operations. <br />1.05 CONTENT <br />A. Identification: Include the following Project identification on the Schedule of <br />Values: <br />1. Project name and location. <br />2. City's name. <br />3. Project number. <br />4. Contractor's name and address. <br />5. Date of original submittal. <br />6. Date of revised submittals. <br />B. Work Activities: Indicate Cost Values for labor, material, equipment, and <br />Contractor's overhead and profit, and Total Cost Value for each line item. <br />1. Distribute Contractor’s office overhead and profit proportionally among <br />allocated cost for each work activity. <br />2. Costs associated with ongoing mobilization activities can be listed <br />separately or distributed evenly among allocated cost for each work <br />activity. <br />3. Assign overhead costs corresponding to start and finish dates for each <br />work-related activity. <br />4. Pro-rate associated work expenses related to work activities, including <br />supervision, temporary utilities, and small tools, over total Contract Time. <br />5. Assign directly related costs, including bonds, insurance, and schedules, <br />to appropriate work activities. <br />6. Claims for additional cost for storage of materials off-site are not accepted <br />as a basis for monetary claims, except where need for off-site storage <br />arose after the Bid and at request of the City.