My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 01 29 73 SCHEDULE OF VALUES <br /> <br />City of Everett 01 29 73-3 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />C. Overhead and Administrative Costs: Distribute major cost items which are not a <br />direct cost of actual work-in-place as line item in Schedule of Values, or <br />distributed as general overhead expense. <br />1. Conditions of the Contract for Mobilization and Demobilization: The lump <br />sum price for Mobilization and Demobilization shall be full compensation <br />for Work consisting of the preparatory Work and operations in mobilizing <br />for beginning Work on the Contract, including, but not limited to, <br />movement of those personnel, equipment, supplies and incidentals to the <br />project site, preparation of submittals, and for the establishment of <br />temporary offices, phone service, safety equipment and first aid supplies, <br />field surveys, sanitation needs and all other facilities required by these <br />specifications, and State and local laws and regulations. The costs of <br />bonds, permits, and any required insurance, and any other <br />preconstruction expense necessary for the start of the Work shall also be <br />included. This Work also consists of the general project management of <br />the Work including, but not limited to, field supervision and office <br />management, as well as other incidental cost for management of the <br />Work during the duration of the Contract. This lump sum shall not exceed <br />5% of the total of all bid items. <br />2. When 5% of the original Contract amount is earned from other bid items, <br />50% of the amount bid for Mobilization and Demobilization, or 5% of the <br />original Contract amount, whichever is lesser, will be paid. <br />3. Upon completion of work for the project, payment of the remaining <br />amount bid for Mobilization and Demobilization will be paid. <br />1.06 LINE ITEM CATEGORIES <br />A. Arrange Schedule of Values in tabular form with separate columns. Break out the <br />following for each work activity listing: <br />1. Section Number from Project Specifications Table of Contents. <br />2. Description of Work. <br />3. Name of subcontractor. <br />4. Scheduled Value for each Item of Work. <br />5. Pervious Work Complete, including Cost Value and Percent Complete. <br />6. Present Work Complete, including Cost Value and Percent Complete. <br />7. Change Orders (numbers) that affect value. <br />8. Total Billing, including Billing to Date, Percent of Contract Sum, and <br />Balance to Finish. Show dollar value as percentage of Contract Sum to <br />nearest one-hundredth percent, adjusted to total 100 percent. <br />9. Retainage. <br />10. Stored Material.
The URL can be used to link to this page
Your browser does not support the video tag.