My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 32 11-1 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 SECTION 01 32 11 CONSTRUCTION CONSTRAINTS AND SEQUENCE PART 1 : GENERAL 1.01 SEQUENCE A. This Section describes the constraints during construction, and the guidelines for construction sequencing that the Contractor shall incorporate into the performance of the contract. 1.02 SUBMITTALS A. Construction Progress Schedule: Prepare the Contractor’s Construction Progress Schedule as defined in Section 01 32 16, based on the constraints and sequence defined herein. 1.03 COORDINATION AND SCHEDULING A. Prior to starting the work, confer with the City to develop a work schedule which will permit adjacent utilities and rights-of-way to function normally. Do not make connections between existing facilities and new work until necessary inspection and tests have been completed on the new work and it is found to conform in all respects to the requirements of the Contract Documents. B. Connection to existing services or utilities, or other work that requires temporary shutdown of any existing operations or utilities shall be planned in detail with appropriate scheduling of the work and coordinated with the City or other impacted utilities. The approved schedule for shutdown or restart shall be indicated on the Contractor’s Progress Schedule, and advance notice shall be given in order that the City may witness the shutdown, tie-in, and startup. 1.04 CONSTRUCTION SEQUENCING A. The construction sequence is provided on Drawing G 2. The construction sequence is provided for Contractor reference only and does not imply direction, means, or methods of construction. The Contractor shall be responsible for completing all elements of work as described in the Contract Documents. 1.05 LONG LEAD ITEMS A. The project will require the Contractor to procure a pre-engineered metal building, and electrical and mechanical equipment, which may be subject to long lead times. The Contractor shall notify the City/Engineer promptly of any equipment or materials with long lead times which prevent the Contractor from completing the project within the Contract Time. Any suspension of Work shall be in accordance with Section 5.3 Suspension Procedures of Specification Section 00 72 00, General Conditions. Any extension of Contract Time shall be in accordance with Section 5.2.2.2 Extensions of Contract Time of Specification Section 00 72 00, General Conditions.
The URL can be used to link to this page
Your browser does not support the video tag.