Section 01 33 00 SUBMITTALS <br /> <br />City of Everett 01 33 00-2 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />B. All Shop Drawing submittals shall be accompanied by standard submittal <br />transmittal form provided by the Contractor and approved by the City. Any <br />submittal not accompanied by such a form, or where all applicable items on the <br />form are not completed, will be returned for resubmittal. <br />C. Consecutively number all submittals. Accompany each submittal with a letter of <br />transmittal showing the transmittal number, date of transmittal, specifications <br />section or drawing number to which the submittal pertains, brief description of the <br />material submitted, and the company name of the originator of the submittal. <br />Resubmittals shall be numbered with the same number as the original submittal <br />followed by a sub nomenclature such as -A, -B, -C, or .01, .02, .03, for example: <br />Original Submittal – 01 5000 <br />Resubmittal 1 – 01 5000.01 <br />Resubmittal 2 – 01 5000.02, etc. <br />Maintain an accurate submittal log for the duration of the construction period, <br />showing status of all submittals. Make the log available to the City upon request. <br />D. Normally, a separate transmittal form shall be used for each specific item or class <br />of material or equipment for which a submittal is required. Transmittal of a <br />submittal of various items using a single transmittal form will be permitted only <br />when the items, taken together, constitute a manufacturer's "package" or are so <br />logically or functionally related that expediency indicates review of the group or <br />package as a whole. A multiple-page submittal shall be collated into sets, and <br />each set shall be stapled or bound, as appropriate, prior to transmittal to the City. <br />E. For most submittals, the City will return prints of each submittal to the Contractor <br />with its comments noted thereon, within 14 calendar days after their receipt at the <br />City’s offices. It is considered reasonable that the Contractor shall make a <br />complete and acceptable submittal to the City by the second submission of a <br />submittal item. The Owner reserves the right to withhold monies due to the <br />Contractor to cover additional costs of the City's review beyond the second <br />submittal. <br />F. If a submittal is returned to the Contractor marked "NO EXCEPTIONS TAKEN,", <br />or “REVIEWED FOR INFORMATION ONLY” formal revision and resubmission of <br />said submittal will not be required. <br />G. If a submittal is returned to the Contractor marked "MAKE CORRECTIONS <br />NOTED," formal revision and resubmission of said submittal will not be required. <br />H. If a submittal is returned to the Contractor marked "AMEND-RESUBMIT," the <br />Contractor shall revise said submittal and shall resubmit the required number of <br />copies of said revised submittal to the City. <br />I. If a submittal is returned to the Contractor marked "REJECTED-RESUBMIT," the <br />Contractor shall revise said submittal and shall resubmit the required number of <br />copies of said revised submittal to the City.