IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 01 33 00 SUBMITTALS <br /> <br />City of Everett 01 33 00-2 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />B. All Shop Drawing submittals shall be accompanied by standard submittal <br />transmittal form provided by the Contractor and approved by the City. Any <br />submittal not accompanied by such a form, or where all applicable items on the <br />form are not completed, will be returned for resubmittal. <br />C. Consecutively number all submittals. Accompany each submittal with a letter of <br />transmittal showing the transmittal number, date of transmittal, specifications <br />section or drawing number to which the submittal pertains, brief description of the <br />material submitted, and the company name of the originator of the submittal. <br />Resubmittals shall be numbered with the same number as the original submittal <br />followed by a sub nomenclature such as -A, -B, -C, or .01, .02, .03, for example: <br />Original Submittal – 01 5000 <br />Resubmittal 1 – 01 5000.01 <br />Resubmittal 2 – 01 5000.02, etc. <br />Maintain an accurate submittal log for the duration of the construction period, <br />showing status of all submittals. Make the log available to the City upon request. <br />D. Normally, a separate transmittal form shall be used for each specific item or class <br />of material or equipment for which a submittal is required. Transmittal of a <br />submittal of various items using a single transmittal form will be permitted only <br />when the items, taken together, constitute a manufacturer's "package" or are so <br />logically or functionally related that expediency indicates review of the group or <br />package as a whole. A multiple-page submittal shall be collated into sets, and <br />each set shall be stapled or bound, as appropriate, prior to transmittal to the City. <br />E. For most submittals, the City will return prints of each submittal to the Contractor <br />with its comments noted thereon, within 14 calendar days after their receipt at the <br />City’s offices. It is considered reasonable that the Contractor shall make a <br />complete and acceptable submittal to the City by the second submission of a <br />submittal item. The Owner reserves the right to withhold monies due to the <br />Contractor to cover additional costs of the City's review beyond the second <br />submittal. <br />F. If a submittal is returned to the Contractor marked "NO EXCEPTIONS TAKEN,", <br />or “REVIEWED FOR INFORMATION ONLY” formal revision and resubmission of <br />said submittal will not be required. <br />G. If a submittal is returned to the Contractor marked "MAKE CORRECTIONS <br />NOTED," formal revision and resubmission of said submittal will not be required. <br />H. If a submittal is returned to the Contractor marked "AMEND-RESUBMIT," the <br />Contractor shall revise said submittal and shall resubmit the required number of <br />copies of said revised submittal to the City. <br />I. If a submittal is returned to the Contractor marked "REJECTED-RESUBMIT," the <br />Contractor shall revise said submittal and shall resubmit the required number of <br />copies of said revised submittal to the City.