IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 01 33 00 SUBMITTALS <br /> <br />City of Everett 01 33 00-3 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />J. Fabrication of an item shall be commenced only after the City has reviewed the <br />pertinent submittals and returned copies to the Contractor marked either “NO <br />EXCEPTIONS TAKEN”, “REVIEWED FOR INFORMATION ONLY” or “MAKE <br />CORRECTIONS NOTED.” Corrections indicated on submittals shall be <br />considered as changes necessary to meet the requirements of the Contract <br />Documents and shall not be taken as the basis for changes to the contract <br />requirements. <br />K. All Contractor shop drawing submittals shall be carefully reviewed by an <br />authorized representative of the Contractor, prior to submission to the City. Each <br />submittal shall be dated, signed, and certified by the Contractor, as being correct <br />and in strict conformance with the Contract Documents. In the case of shop <br />drawings, each sheet shall be so dated, signed, and certified. No consideration <br />for review by the City of any Contractor submittals will be made for any items <br />which have not been so certified by the Contractor. All non-certified submittals <br />will be returned to the Contractor without action taken by the City, and any delays <br />caused thereby shall be the total responsibility of the Contractor. <br />L. The City's review of Contractor shop drawings submittals shall not relieve the <br />Contractor of the entire responsibility for the correctness of details and <br />dimensions. The Contractor shall assume all responsibility and risk for any misfits <br />due to any errors in Contractor submittals. The Contractor shall be responsible <br />for the dimensions and the design of adequate connections and details. <br />M. The Contractor’s Submittals and Shop Drawings shall not be used to submit <br />substitutions of materials or methods required by the Contract. Instead, all <br />requests for substitutions shall be made as a separate request. <br />N. This review is only for general conformance with the design concept of the <br />project and the information given in the Contract Documents. Corrections or <br />comments made on the project data submittals and shop drawings during this <br />review do not relieve the Contractor from his/her obligation to perform fully all <br />contract requirements. Contractor is not entitled to rely upon the corrections or <br />comments made on the project data submittals and shop drawings during this <br />review. The review by the Engineer of project data and shop drawings is only for <br />conformance with the general design concept of the project, and does not extend <br />to consideration of specific dimensions, structural integrity, safety, detailed <br />installation and construction requirements, or any other obligation of the <br />Contractor. Review of a specific item shall not include review of an assembly of <br />which the item is a component. The review by the Engineer is for the benefit of <br />the Owner only. Any action shown is subject to the requirements of the Contract <br />Documents. Neither the review of the Contractor’s submittal nor the corrections <br />or comments provided herein, shall create any duty owed to or a cause of action <br />in favor of the Contractor or any Subcontractor. Contractor is responsible for: <br />dimensions which shall be confirmed and correlated at the job site; information <br />that pertains solely to the fabrication processes or to means, methods, <br />techniques sequences and procedures of construction, coordination of the Work <br />with that of all other trades and performing all Work in a safe and satisfactory <br />manner.