My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 01 33 00 SUBMITTALS <br /> <br />City of Everett 01 33 00-7 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />B. The Field Record Drawings shall be kept in the Contractor’s site office and shall <br />be available for review by the City at all times. The Field Record Drawings shall <br />be maintained by the Contractor to reflect the current state of the work at all <br />times. The Field Record Drawings shall be updated at least daily, and any <br />changes occurring on one day shall be entered on the Field Record Drawings by <br />noon on the next working day. The Contractor and City shall review the record <br />drawings together at least weekly, during regular site meetings. The Contractor’s <br />pay estimates or other pay requests shall not be considered complete or payable <br />unless the Field Record Drawings are current as required by this Section. <br />PRODUCTS <br />Not Used. <br /> <br />EXECUTION <br />Not Used. <br /> <br />END OF SECTION 01 33 00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.