My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />City of Everett 01 35 29-1 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />SECTION 01 35 29 <br />HEALTH AND SAFETY <br />PART 1 : GENERAL <br />1.01 SUMMARY <br />A. This Section covers the requirements for compliance with health and safety <br />precautions and controls for projects without hazardous waste operations. <br />B. Safety plan. <br />C. Protection of equipment, public and City staff. <br />1.02 REFERENCES <br />A. General: The publications listed below form a part of these specifications to the <br />extent referenced. The publications are referred to in the text by basic <br />designations only. <br />B. Code of Federal and State Regulations: <br />1. OSHA General Industry Safety and Health Standards (29 CFR 1910), <br />Publication V2206; OSHA Construction Industry Standards (29 CFR <br />1926). <br />2. National Emission Standards for Hazardous Air Pollutants (40 CFR, part <br />61). <br />3. Washington State Department of Labor and Industries (WISHA) 49.17- <br />49.26 RCW. <br />4. Washington Administration Code (WAC) 296-155 Safety Standards for <br />Construction Work. <br />1.03 SUBMITTALS <br />A. The Contractor shall submit the following submittals. <br />1. Health and Safety Plan (specific to this project): <br />a. This plan shall be delivered within 5 days after Notice to Proceed <br />has been received. <br />b. The plan will be reviewed for completeness. <br />2. Copies of all minutes/notes from daily safety meetings. <br />1.04 HEALTH AND SAFETY PLAN <br />A. The Contractor shall develop a Site Specific Health and Safety Plan (Safety Plan) <br />addressing health and safety management methods specific to the project. The <br />Safety Plan shall, at a minimum, include: <br />1. The name of the individual at the jobsite responsible for implementation <br />and compliance with this Safety Plan.
The URL can be used to link to this page
Your browser does not support the video tag.