My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 01 35 29 HEALTH AND SAFETY <br /> <br />City of Everett 01 35 29-2 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />2. If work requires the use of Fall Restraint or Fall Arrest, a Fall Protection <br />work plan meeting the requirements set forth in WAC 296-155 shall be <br />included. <br />3. If applicable, the Safety Plan shall include the name and qualifications of <br />any electrical safety observer to be provided by the Contractor. <br />4. Steps taken to provide Protection of the Public and City Employees. This <br />includes protection from falling objects. Indicated type of overhead <br />safeguards and protection to be installed and safeguards from equipment <br />damage due to debris (including nails) on the ground. <br />5. A description of tasks to be undertaken, and equipment mobilized for this <br />project. <br />6. A list of all known and expected safety or health hazards, problems, and <br />proposed control mechanisms. <br />7. Safety Data Sheets (SDS) of and procedures for using, disposing of, or <br />storing for all chemicals, products, or materials regulated by WAC 296-62 <br />to be used by the Contractor. <br />8. A list of personal protective equipment, monitoring devices, and hazard- <br />specific plans or permits as appropriate and required by State and <br />Federal regulations. <br />9. A description of emergency response measures, equipment available for <br />emergency response to address accidents and releases of materials, <br />including, but not limited to, first aid, eye wash/showers, and fire <br />extinguishing equipment, and location of this equipment at the jobsite. <br />10. Emergency phone numbers contacts, and location of the nearest medical <br />facility. <br />11. A monitoring and inspection plan and record keeping measures to ensure <br />that equipment and work practices comply with this Safety Plan. <br />12. Personnel names, training, and notification procedures as appropriate to <br />ensure that all jobsite personnel are familiar with the Safety Plan <br />elements. Include copies of training certificates. <br />13. Procedures for safe storage and handling of flammable liquids, in <br />accordance with WAC 296-24-330. <br />14. If applicable the Contractor shall include procedures for safe storage and <br />handling of compressed gasses in accordance with WAC 296-24-295, <br />Compressed Gas General Requirement. <br />15. Other issues which the Contractor determines are appropriate and <br />necessary to protect worker safety and health. <br />16. This Safety Plan shall be posted and marked in a location on site that will <br />be noticed upon entry of work site. A fall protection plan must also be <br />established and shall be posted next to the Safety Plan (Accident <br />Prevention Program). These postings are required to be protected from <br />inclement weather and must be legible during the extent of this contract.
The URL can be used to link to this page
Your browser does not support the video tag.