My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 21 13 INSTRUCTIONS TO BIDDERS City of Everett 00 21 13-12 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 1-03.5 Failure to Execute Contract Failure to return the proof of insurance and the bonds with the signed Contract as required in these Instructions, or failure or refusal to sign the Contract, or failure to register as a contractor in the state of Washington shall result in forfeiture of the bid bond or deposit of this Bidder. If this should occur, the City may then Award the Contract to the second lowest responsible Bidder or reject all remaining Bids. If the second lowest responsible Bidder fails to return the required documents as stated above within the time provided after Award, the Contract may then be Awarded successively in a like manner to the remaining lowest responsible Bidders until the above requirements are met or the remaining Bid are rejected. In addition, failure to have or obtain a City of Everett business license prior to executing the Contract, unless immediately cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond or deposit of this Bidder. 1-03.6 Return of Bid Deposit When Bids have been examined and corrected as necessary, proposal bonds and deposits accompanying Bids ineligible for further consideration will be returned. All other proposal bonds and deposits will be held until the Contract has been properly executed. When the Contract has been properly executed, all remaining deposits or bonds, except those subject to forfeiture, will be returned. Within 15 calendar days after the Bids are opened, the City will return the bid deposit accompanying the Bids that are not to be considered in making the Award. 1-03.7 Judicial Review All protests by Bidders must be in accordance with Chapter 3.46 of the Everett Municipal Code, “Bid Protest Procedures.” The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. OTHER MATTERS Time of Completion The Contractor shall complete the Work on or before the date or dates specified in Section 00 52 13 - CONTRACT FORM Equal Employment Opportunity The Contractor will be required to assure that equal employment opportunities will be in effect to all individuals throughout the duration of this Contract, pursuant to SECTION 00 72 00, Part 7 “Labor Standards,” of the Contract Documents. The Contractor must comply with all local, State and Federal laws pertaining to non-discrimination and equal employment opportunity. Sales Tax The Washington State Department of Revenue has issued special rules on the State sales tax. The Contractor should contact the Washington State Department of Revenue for answers to questions in this area. The City will not adjust its payment if the Contractor bases a Bid on a misunderstood tax liability. The Contractor shall not include State retail sales
The URL can be used to link to this page
Your browser does not support the video tag.