IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 21 13 INSTRUCTIONS TO BIDDERS City of Everett 00 21 13-14 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to the Subcontractor shall be submitted to the Employment Standards Division, State Department of Labor and Industries, Olympia, Washington. If the prime contract is over $1,000,000, then Contractor also needs to submit L&I Form F700-164-000 (Affidavit of Wages Paid EHB 2805 Addendum). 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll Form WH347 may use State of Compliance found on the back of the form. 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH348): Contractors, Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall attach the Statement of Compliance Form WH348 to each payroll. 8. Approval of Subcontractors: Contractors shall request approval of Subcontractors on a form provided by the City prior to their working on the Site. 9. Construction Progress Schedule: To be submitted as required by Section 00 72 00, Part 5 “Progress and Completion”, of the Contract Documents by the Contractor within ten calendar days, or such time as determined by the City, after the date of receipt of Notice to Proceed. 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City’s Design and Construction Standards. If, and to the extent, such plans are not sufficient, complete or adequate to support the Bidder’s planned means and methods of performing the Work, the Bidder must develop an adequate, complete and sufficient traffic control plan at its cost, that shall be submitted for the City’s approval prior to construction. Deviation from the Standard Plans must be submitted by the Contractor and approved by the City prior to construction. 11. Disposal Sites: Provide the City with the location of all disposal sites to be used, and also provide copies of the permits and approvals for such disposal sites. The Contractor shall provide the City with copies of all permits for disposal and storage of surplus materials within ten calendar days after award of the Contract. END OF SECTION 00 21 13