My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 22 13-1 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 SECTION 00 22 13 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS PART 1 : GENERAL 1.01 GENERAL A. It is the intent of City to award a contract to the lowest responsive and responsible Bidder. Before award, the Bidder must also meet the supplemental bidder responsibility criteria listed below. Further, the apparent low Bidder and second apparent low bidder must submit the Bidder Qualification Statement (Section 00 45 13) and any other documentation listed below to the City within one business day after the bid opening, unless the City’s project manager, in writing, allows additional time. The City reserves the right to require such documentation from other bidders also. 1.02 SUPPLEMENTAL RESPONSIBILITY CRITERIA A. Experience: 1. Criteria: a. The Bidder must have successfully completed at least three (3) Similar Projects within the ten (10) years prior to bid opening. b. The Bidder’s project manager for the Project must have successfully supervised to completion at least three (3) Similar Projects within the ten (10) years prior to bid opening. c. The Bidder’s superintendent for the Project must have successfully supervised to completion at least three (3) Similar Projects within the ten (10) years prior to bid opening. d. The Bidder’s principal foreman for the Project must have successfully supervised to completion at least three (3) Similar Projects within the ten (10) years prior to bid opening. 2. Definition of Similar Project: a. A “Similar Project” means a project that meets all of the following requirements: 1) Awarded total contract value of at least $1,000,000. 2) Work involving the construction of large-scale infrastructure components similar to the WFP Air Scour Blower Building Replacement Project. 3. Documentation: The Bidder shall submit the Bidder Qualification Statement as provided in Section 00 45 13. The City may also use independent sources of information that may be available to demonstrate whether the Bidder is in compliance with these criteria.