Laserfiche WebLink
Section 00 41 13 BID FORM City of Everett 00 41 13-3 June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 B. If this Bid is accepted by the Owner within the time period stated above, we will: 1. Execute the Agreement within 14 days of receipt of Notice of Award. 2. Furnish the required 100% payment and 100% performance bonds within 14 calendar days of receipt of Notice of Award in the form described in Contract Documents. 3. Submit to the City in pdf format within 14 calendar days of receipt of Notice of Award the certificate of insurance and additional insured endorsements in accordance with the Contract Documents. 4. Commence Work within seven calendar days after receipt of Notice to Proceed. C. If this Bid is accepted within the indicated time, and we fail to commence the Work or we fail to provide the required bonds, the Bid security shall be forfeited as damages to the Owner by reason of our failure, limited in amount to the lesser of the face value of the Bid security or the difference between this Bid and the Bid upon which Contract is signed. D. In the event our Bid is not accepted within the time stated above, the required Bid security will be returned to the undersigned, according to the provisions of the Instructions to Bidders, unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time. 1.04 CONTRACT TIME A. If this Bid is accepted, we will: 1. Begin work immediately after receiving Owner’s letter of Notice to Proceed and to reach Substantial Completion within the dates required under the Contract Documents. 2. Agree to pay liquidated damages to the City as stated in the Contract in the event the project is not completed on or before required time periods. 3. Contract with the Owner using the Contract form provided herewith, on the terms and conditions contained herein, to do everything necessary to complete the construction of the project in the allotted time. 1.05 ADDENDA A. Following Addenda have been received, and the modifications to the Bid Documents noted below have been considered and all costs are included in the Bid. Addendum No…………….., dated …………….. Addendum No…………….., dated …………….. Addendum No…………….., dated …………….. Addendum No…………….., dated ……………..