Laserfiche WebLink
TABLE OF CONTENTS City of Everett TOC-ii June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 01 50 00 Temporary Facilities and Controls 01 60 00 Materials and Equipment 01 64 10 Installation of Owner-Furnished Equipment 01 74 23 Final Cleaning 01 77 00 Closeout Procedures 01 79 39.13 Record Drawings 01 91 10 Facility Startup and Testing 01 91 11 Facility Training 01 91 12 Operation and Maintenance Data DIVISION 03 – CONCRETE 03 00 00 Concrete General Requirements 03 05 10 Cold Weather Concreting 03 05 20 Hot Weather Concreting 03 10 00 Concrete Formwork 03 15 00 Concrete Accessories General 03 20 00 Concrete Reinforcement 03 30 00 Cast-In-Place Concrete 03 31 00 Concrete Mixtures DIVISION 08 – OPENINGS 08 11 13 Hollow Metal Doors and Frames 08 33 00 Overhead Coiling Doors 08 70 00 Door Hardware DIVISION 09 – FINISHES 09 90 00 Building Painting DIVISION 11 – EQUIPMENT 11 00 10 Equipment General Provisions 11 31 21 Pre-Engineered Metal Building DIVISION 13 – SPECIAL CONSTRUCTION 13 53 00 Seismic Restraint Requirements for Non-Structural Components DIVISION 23 – HVAC 23 05 00 Common Work Results for HVAC 23 05 05 Project Closeout for HVAC 23 05 29 Hangers and Supports for HVAC Piping and Equipment