My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:24:30 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
TABLE OF CONTENTS City of Everett TOC-iii June 2024 WFP Air Scour Blower Building Replacement Issued for Bid UP3813 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 34 23 HVAC Power Ventilators 23 37 00 Air Outlets and Inlets DIVISION 26 – ELECTRICAL 26 00 00 General Electrical 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 23 Control-Voltage Electrical Power Cables 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 05 48.16 Seismic Controls for Electrical Systems 26 12 10 Dry Type Transformers 26 24 16 Panelboards 26 27 26 Wiring Devices 26 29 13.13 Across-the-Line Motor Controllers 26 29 23.10 Variable-Frequency Motor Controllers 26 43 10 Surge Protective Device 26 50 00 Lighting DIVISION 28 – ELECTRONIC SAFETY AND SECURITY 28 13 00 Access Control DIVISION 31 – EARTHWORK 31 23 43 Earthwork 31 25 14 Soil Erosion and Sediment Control 31 41 00 Excavation Support Systems DIVISION 40 – PROCESS INTEGRATION 40 05 07 Piping and Mechanical Equipment Support 40 05 67 Valves 40 12 53 Process Piping and Fittings APPENDICES Appendix A Prevailing Wage Rates Appendix B Owner-Furnished Equipment Documentation END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.