IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-5 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />Substantial Completion: The day on which the Owner or Owner’s Representative determines <br />the Owner has full and unrestricted use and benefit of the Project, from both the operational and <br />safety standpoints and only minor incidental Work, replacement of temporary substitute <br />facilities, or minor correction or repair Work remains. Determination of Substantial Completion in <br />whole or in part is solely at the discretion of the Owner. Substantial Completion does not mean <br />complete in accordance with the Contract nor shall Substantial Completion of all or any part of <br />the Project entitle the Contractor to Final Acceptance under the Contract. <br />Supplier: A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a <br />direct contract with Contractor or with any Subcontractor to furnish materials or Equipment to be <br />incorporated in the Work. <br />Total Float: The amount of time any given activity or path of activities may be delayed before it <br />will affect the Completion Date. <br />Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, <br />and equestrian traffic. <br />Unabsorbed Overhead: The reduction or loss of contribution to recovery of the Contractor’s <br />Overhead costs realized by the result of reduced Project or Contractor billings, or both, due to <br />any reason whatsoever, including a Project extension. <br />Unit Price Work: Refers to items of Work identified by unit prices in the Bid form. <br />Work: Refers to the Project and the provision of all labor, materials, Equipment, supplies, <br />services, and other items necessary for the execution, completion and fulfillment of the <br />Contract. <br />1.2. CONTRACT DOCUMENTS <br />The complete Contract includes the following, which are Contract Documents: <br />1. Federal and state requirements that apply to this Contract and Project; <br />2. Supplemental agreements between Owner and Contractor, if any, subsequent to the <br />Owner’s execution of the Contract and signed by the Mayor of the City of Everett for <br />Owner and by an authorized representative of Contractor; <br />3. Change Orders; <br />4. Addenda; <br />5. The Contract; <br />6. Bid Form; <br />7. Specifications, including, but not limited to, these General Conditions and other <br />numbered Documents and Sections; <br />8. Supplementary Conditions, if any; <br />9. Drawings and plans; <br />10. City of Everett standard plans in effect as of the date Bids are opened; <br />11. Notice to Bidders/Instructions to Bidders; and <br />12. Certifications and affidavits as required by this Contract and by law. <br />Any inconsistency in the parts of the Contract shall be resolved by following this order of <br />precedence in the list above (e.g., 1 presiding over 2, 3, 4, 5, and 6; 2 presiding over 3, 4, 5, <br />and 6; and so forth). This order of precedence shall not apply when Work is required by one part <br />of the Contract but omitted from another part or parts of the Contract. The Work required in one <br />part must be furnished even if not mentioned in other parts of the Contract.