Laserfiche WebLink
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-6 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />These parts complement each other in describing the complete Work. Any requirement in one <br />part binds as if stated in all parts. The Contractor shall provide any work or materials clearly <br />implied in the Contract even if the Contract does not mention it specifically. Any inconsistency in <br />the parts of the Contract shall be referred to the Owner’s Representative attention for a <br />determination of the intended requirements. <br />The Work required in one part must be furnished even if not mentioned in other parts of the <br />Contract. If any part of the Contract requires Work that does not include a description for how <br />the Work is to be performed, the Work shall be performed in accordance with standard trade <br />practice(s). For purposes of the Contract, a standard trade practice is one having such regularity <br />of observance in the trade as to justify an expectation that the Contractor will follow or observe <br />the practice in performing the Work. In case of any ambiguity, disagreement or Dispute over <br />interpreting the Contract, the Owner’s Representative’s decision will be final as provided in <br />these General Conditions. <br />Approved Shop Drawings, other Contractor’s Submittals, and the reports and drawings of <br />subsurface and physical conditions are not Contract Documents. <br />2. SPECIFICATIONS AND DRAWINGS <br />2.1. INTERPRETATION OF SPECIFICATIONS AND DRAWINGS <br />The Specifications and Drawings are intended to be explanatory and supportive of each other. <br />Work specified on the Drawings and not in the Specifications, or vice versa, shall be executed <br />as if specified in both. In the event the Work to be done or matters relative thereto are not <br />sufficiently detailed or explained in the Contract Documents, the Contractor shall immediately <br />ask the Owner’s Representative for further explanation and shall comply with such explanation. <br />In the event of doubt or question arising respecting the true meaning of the Specifications or <br />Drawings, Contractor shall refer to the Owner’s Representative for his or her decision. <br />The Specifications may vary in form, format and style. Some specification sections are written in <br />varying degrees of streamlined or declarative style and some sections may be relatively <br />narrative by comparison. Omissions of such words and phrases as "the Contractor shall," "in <br />conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted <br />words and phrases shall be supplied by inference. Similar types of provisions may appear in <br />various parts of a section or articles within a part depending on the format of the section. The <br />Contractor shall not take advantage of any variation of form, format or style in making claims for <br />extra Work. <br />The cross referencing of specification sections under the subparagraph heading "Related <br />Sections include but are not necessarily limited to:" and elsewhere within each specification <br />section is provided as an aid and convenience to the Contractor. The Contractor shall not rely <br />on the cross referencing provided and shall be responsible to coordinate the entire Work under <br />the Contract Documents and provide a complete Project whether or not the cross referencing is <br />provided in each section or whether or not the cross referencing is complete. <br />Reference to standards, specifications, manuals, or codes of any technical society, <br />organization, or association, or to Laws or Regulations, whether such reference be specific or <br />by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in <br />effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no <br />Bids), except as may be otherwise specifically stated in the Contract Documents. <br />No provision of a standard, specification, manual or code, or an instruction of a Supplier shall be <br />effective to change the duties or responsibilities of Owner, Contractor, or Owner’s <br />Representative, or their Subcontractors, consultants, agents, or employees from those set forth <br />in the Contract Documents. No such provision or instruction shall be effective to assign to