IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-9 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />Contractor from complying with Contract requirements. The Owner’s approval of a Submittal <br />does not constitute a waiver of the Contract requirements. The Owner or Owner’s <br />Representative shall respond to a Submittal within thirty (30) days of receipt. The Owner or <br />Owner’s Representative may extend this time for good cause by notifying the Contractor. The <br />Owner will not be obligated to accept or pay for Work performed by the Contractor that may be <br />affected by materials, Equipment, or methods of work not submitted in a timely manner so that <br />final review can be accomplished before the affected Work is complete. The Owner shall not be <br />responsible for Delays, inefficiencies, or any additional costs or expenses caused in whole or in <br />part by Contractor’s failure to submit required information in sufficient time for review, comment, <br />and correction. Contractor’s failure to submit required information in sufficient time for review, <br />comment and correction shall be deemed a waiver of any and all Contract Claims for <br />adjustment of Contract Sum or Contract Time arising out of, or related to, such a Submittal. <br />Contractor acknowledges and agrees that it may not rely upon receiving the Owner’s response <br />to a Submittal in less than thirty (30) days, unless the Owner explicitly changes this section by a <br />signed Change Order. Requests for information or clarification from the Contractor to the Owner <br />shall be treated as a Submittal. <br />2.5. CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS <br />The Contractor shall keep at the construction site at least one set of Contract Documents and <br />one set of full-size Drawings that shall be available to the Owner’s Representative and Owner. <br />3. OWNER <br />3.1. GENERAL <br />The Owner, and the Owner’s Representative, shall have the authority to act as the sole judge of <br />the Work, Equipment and materials with respect to both quantity and quality as set forth in the <br />Contract. It is expressly stipulated that the Drawings, Specifications and other Contract <br />Documents set forth the requirements as to the nature of the completed Work and do not <br />purport to control the method of performing Work except in those instances where the nature of <br />the completed Work is dependent on the method of performance. <br />The Owner has the authority to act, do, perform, and make any all decisions and actions <br />authorized by the Contract Documents, including, but not limited to, Change Orders, progress <br />payments, Contract decisions, acceptability of the Contractor's Work, and early possession. The <br />Owner has the authority to accept or reject requests for progress payments that have been <br />submitted by the Contractor and recommended by the Owner’s Representative. The Owner has <br />the authority to make determinations of the acceptability of the Work. The Owner also has the <br />authority to accept or reject the Owner’s Representative's recommendations regarding retention <br />of defective Work. <br />3.2. OWNER’S REPRESENTATIVE <br />The Owner’s Representative shall be satisfied that all the Work is being done in accordance <br />with the requirements of the Contract. The Contract and Specifications give the Owner’s <br />Representative authority over the administration of the Contract. Whenever it is so provided in <br />this Contract, the decision of the Owner’s Representative shall be final. <br />The Owner’s Representative’s decisions will be final on all questions including but not limited to, <br />unless specifically assigned to an Architect or Engineer, the following: <br />1. Measurement of Work, whether lump sum, Force Account, or unit price; <br />2. Acceptability of rates of progress on the Work; <br />3. Interpretation of Drawings and Specifications with regard to administrative matters;