IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-11 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />be on sheets measuring 22 by 34 inches, 11 by 17 inches, on sheets with dimensions in <br />multiples of 8 1 /2 by 11 inches, or other size approved by the Owner consistent with the Work <br />to be detailed. Contractor shall provide drawings far enough in advance of ordering or <br />installation to allow for review by the Owner’s Representative or other agencies and possible <br />resubmittal and further review after resubmittal. After a plan or drawing has been reviewed and <br />returned to the Contractor, all changes proposed by the Contractor may be submitted to the <br />Owner’s Representative for review and comment. <br />The Contractor shall obtain the Owner’s Representative’s written acknowledgement of approved <br />Submittals before proceeding with the Work represented by the Submittal. Such review does not <br />impose any responsibility upon the Owner, nor does it relieve the Contractor of any <br />responsibility for the accuracy of the Submittal or its conformity with the Contract. The <br />Contractor shall bear all risk and all costs of any Work delays caused by resubmittal or <br />correction of Submittals. The Contractor shall allow sufficient time for Owner’s review of <br />Submittals and possible corrections by the Contractor so as not to delay the Work. <br />The Contractor’s Bid price shall include all costs of all Submittals, including, but not limited to, <br />working, detail and shop drawings. <br />4. CONTRACTOR <br />4.1. CONTRACTOR'S REPRESENTATIVE <br />The Contractor shall notify the Owner in writing of the name of the person who will act as the <br />Contractor's representative and shall have the authority to act in matters relating to this <br />Contract. This person shall have authority to carry out the provisions of the Contract and to <br />supply materials, Equipment, tools and labor without delay for the performance of the Work. <br />Contractor shall employ and keep on Site on a full time basis personnel experienced in the <br />management of construction of projects of this size and type. These shall include, but not be <br />limited to, a project manager and superintendent. Neither the Contractor’s project manager nor <br />the superintendent shall have supervisory responsibility for other Projects for the Contractor <br />while assigned to this Project. Contractor shall employ and assign such additional, full time <br />office, support and engineering personnel to support the project manager and superintendent <br />and allow timely completion of the Project. The project manager and superintendent shall be <br />approved by the Owner, and such approval shall not be unreasonably withheld. Contractor <br />acknowledges that one of the instances in which it will be reasonable for the Owner to withhold <br />consent is if the project manager or superintendent is different than as stated in the Bidder <br />Qualification Statement. Contractor shall submit personnel qualifications within ten (10) days of <br />Contractor’s execution of the Contract. Bases for disapproval include, but are not limited to, lack <br />of sufficient experience managing the construction of similar type or size projects or <br />relationships on other projects unsatisfactory to the Owner. Owner may require removal and <br />replacement of Contractor’s supervisory staff who are disruptive or who appear to lack sufficient <br />competence to complete the Project successfully. <br />4.2. CONSTRUCTION PROCEDURES <br />The Contractor shall supervise and direct the Work and determine the means, methods, <br />techniques, sequences and procedures of construction, except in those instances where the <br />Owner, to define the quality of an item of Work, specifies in the Contract, a means, method, <br />technique, sequence or procedure for construction of that item of Work. <br />4.3. SUBCONTRACTORS <br />Unless explicitly specified elsewhere in the Contract Documents or expressly authorized in <br />writing by the Owner before Contractor submits its Bid, the Contractor shall perform with its own