My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-12 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />organization at least one-third of the Work by dollar volume and Contractor shall not sublet to a <br />single Subcontractor more than one-half of the Project. A Subcontractor of the Contractor shall <br />not sublet to another Subcontractor more than one-half of its work without the written consent of <br />the Owner obtained within twenty (20) days of award of the Contract to the Contractor. The <br />Owner may refuse to approve such subcontract for any reason. Only unit price and Schedule of <br />Value items of the Contract will be used in computing the total Work. The Owner may, at its sole <br />option, refuse to approve a Subcontractor that is also providing services to the Owner on the <br />same project. <br />Subcontractors will be considered agents of the Contractor and their work shall be subject to the <br />provisions of the Contract. References in the Contract Documents to actions required of <br />Subcontractors, manufacturers, Suppliers, or persons other than the Contractor, the Owner or <br />the Owner's Representative shall be interpreted as requiring that the Contractor shall require <br />such Subcontractor, manufacturer, Supplier or Person to perform the specified action. <br />Contractor shall comply with RCW 39.04.250 and RCW 39.76.011, as amended, and any <br />successor and other laws, ordinances, and regulations regarding payment of Subcontractors. <br />Contractor shall also comply with the requirements of RCW Chap. 60.28 and any other law, <br />ordinance, or regulation relating to the release of retainage to Subcontractors. <br />The Contractor shall specifically include in each of its first tier subcontracts the language in this <br />section with regard to the Subcontractor’s obligation to meet bidder responsibility criteria, and <br />shall require each of its Subcontractors to include substantially the same language of this <br />section in each of their subcontracts, adjusting only as necessary the terms used for the <br />contracting parties. The requirements of this section apply to all Subcontractors regardless of <br />tier. <br />At the time of subcontract execution, the Contractor must verify that each of its first tier <br />subcontracts meets the following bidder responsibility criteria: <br />1. At the time of subcontract Bid Submittal, have a certificate of registration in compliance <br />with Chapter 18.27 RCW; <br />2. Have a current state unified business identifier number; <br />3. If applicable, have: <br />a. Industrial insurance coverage for the Subcontractor’s employees working in <br />Washington as required in Title 51 RCW; <br />b. An employment security department number as required in Title 50 RCW; <br />c. A state excise tax registration number as required in Title 82 RCW; <br />d. An electrical contractor license, if required by Chapter 19.28 RCW; <br />e. An elevator contractor license, if required by Chapter 70.87 RCW. <br />4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or <br />39.12.065(3). <br />5. If bidding on a public works project subject to the apprenticeship utilization requirements <br />in RCW 39.04.320, not have been found out of compliance by the Washington state <br />apprenticeship and training council for working apprentices out of ratio, without <br />appropriate supervision, or outside their approved work processes as outlined in their <br />standards of apprenticeship under chapter 49.04 RCW for the one-year period <br />immediately preceding the date of the bid solicitation; <br />6. Within the three-year period immediately preceding the date of the bid solicitation, not <br />have been determined by a final and binding citation and notice of assessment issued by <br />the department of labor and industries or through a civil judgment entered by a court of
The URL can be used to link to this page
Your browser does not support the video tag.