My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-13 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any <br />provision of chapter 49.46, 49.48, or 49.52 RCW; and <br />7. Have received training on the requirements related to public works and prevailing wage <br />under in accordance with the requirements of RCW 39.04.350(f), or demonstrate <br />exemption from such requirements. <br />The Contract Documents shall apply to Subcontractors and Suppliers as if each had signed the <br />Contract with the Owner. Contractor shall include the provisions of these Contract Documents <br />or a “flow down” clause in each contract with Subcontractors and Suppliers. <br />4.4. RESPONSIBILITIES <br />4.4.1. Subcontractors, Manufacturers and Suppliers <br />The Contractor shall be responsible for the adequacy, efficiency and sufficiency of <br />Subcontractors, manufacturers, Suppliers and their employees. <br />4.4.2. Contractor's Employees <br />The Contractor shall be responsible for the adequacy, efficiency and sufficiency of its <br />employees. Workers shall have sufficient knowledge, skill and experience to perform properly <br />the Work assigned to them. <br />4.4.3. Payment for Labor and Materials <br />The Contractor shall pay and require its Subcontractors to pay any and all accounts for labor <br />including Worker's Compensation premiums, State Unemployment and Federal Social Security <br />payments and other wage and salary deductions required by law. The Contractor also shall pay <br />and cause its Subcontractors to pay any and all accounts for services, Equipment, and <br />materials used by him and its Subcontractors during the performance of Work under this <br />Contract. The Contractor shall pay such accounts as they become due and payable. If <br />requested by the Owner, the Contractor shall promptly furnish proof of payment of such <br />accounts to the Owner. <br />4.4.4. Attention to Work <br />The Contractor, acting through its representative, shall give personal attention to and shall <br />manage the Work so that it shall be prosecuted faithfully and completed under the Project <br />schedule. When its representative is not personally present at the Project Site, its designated <br />alternate shall be available and shall have the authority to act in matters relating to this <br />Contract. <br />4.4.5. Safety <br />The Contractor alone shall be responsible for safety on the job Site, including, but not limited to, <br />the safety of its and its Subcontractor's employees. The Contractor shall maintain the Project <br />Site and perform the Work in a manner which meets the Owner's responsibility under statutory <br />and common law for the provision of a safe place to work. <br />4.4.6. Threats, Intimidation and Harassment Forbidden <br />Contractor shall not allow its employees, its Subcontractors, its Subcontractors’ employees, or <br />any other agents to threaten bodily injury or property damage, to intimidate or attempt to <br />intimidate any person, or to assault or physically harass any person. Forbidden conduct <br />includes, but is not limited to, threatening, appearing, or actually doing any of the following: <br />pushing, shoving, striking, physically blocking a person or a person’s vehicle, vandalism, <br />malicious mischief, or any other act that a reasonable person would understand be intended to <br />intimidate, cause personal injury, or cause property damage. Contractor shall remove from the <br />job site any person reasonably under its control or direction who the Contractor or Owner <br />reasonably believes violated this section. The lack of a request from the Owner or Owner’s
The URL can be used to link to this page
Your browser does not support the video tag.