My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-16 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />Contractor, Owner, and Owner’s Representative shall meet as often as determined by the <br />Owner’s Representative, but no less often than once each month. The purpose of the meeting is <br />to review Project status in relation to the construction schedule; review value of Work completed <br />during the previous month; and, if applicable, review Contractor's plans to return Project status <br />to that required by the schedule. If requested by the Owner or Owner’s Representative, the <br />Contractor shall submit a written progress report within five (5) days following this meeting, <br />comprising: <br />1. The current construction schedule indicating percent complete, actual completion or start <br />dates since the previous review, the estimated remaining duration for each activity in <br />progress, Schedule of Values update, and narrative summary. <br />2. Reasons any activities are behind schedule and the corrective steps being taken. <br /> 4.5.4. Cooperation with Others <br />The Contractor agrees to permit entry to the Site of the Work by the Owner, its employees or <br />other contractors performing work on behalf of the Owner. The Contractor shall afford to the <br />Owner, other contractors and their employees, reasonable facilities and cooperation and shall <br />arrange its work and dispose of its materials in such a manner as to not interfere with the <br />activities of the Owner or of others upon the Site of Work. The Contractor shall promptly make <br />good any Contractor-caused injury or damage to persons or property that may be sustained by <br />other contractors or employees of the Owner. The Contractor shall join its work to that of others <br />and perform its work in proper sequence in relation to that of others. <br />If requested by the Contractor, the Owner will arrange meetings with other contractors <br />performing work on behalf of the Owner to plan coordination of construction activities. The <br />Contractor shall inform itself of the planned activities of other contractors and will coordinate its <br />work with the other contractors. <br />Contractor shall notify the Owner of problems, interference or any difficulty with other <br />contractors or workers engaged by the Owner. The Notice shall be sufficiently prompt and <br />specific so as to allow the Owner to mitigate or avoid increased costs, time of performance, <br />damages or injury. Contractor’s failure to provide such Notice in a timely way shall be deemed a <br />waiver and release of any and all Contract Claims relating to, arising out of, or caused by, any <br />alleged interference, difficulty or problem with another contractor or worker engaged by the <br />Owner. <br />5. PROGRESS AND COMPLETION <br />5.1. NOTICE TO PROCEED <br />Following execution of the Contract by the Owner, the Owner or Owner’s Representative will <br />give the Contractor a written Notice to Proceed. Notwithstanding other provisions of the <br />Contract, the Contractor shall not be obligated to perform Work, and the Owner will not be <br />obligated to accept or pay for Work performed by the Contractor or be liable for any Delays, <br />prior to delivery of the Notice to Proceed. The Owner's knowledge of Work being performed <br />prior to delivery of the Notice to Proceed will not obligate the Owner to accept or pay for such <br />Work. Contractor waives any and all Contract Claims for an adjustment of Contract Sum and <br />Contract Time arising out of, or related to, work it performs prior to receipt of the Notice to <br />Proceed. The Owner may issue partial Notices to Proceed. <br />5.2. CONTRACT TIME <br />5.2.1. General <br />TIME IS OF THE ESSENCE IN PERFORMING THE CONTRACT. Failure to complete the <br />Project within the contractually specified time may affect other Projects and Owner activities.
The URL can be used to link to this page
Your browser does not support the video tag.