My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 8/28/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 8/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:25 AM
Creation date
8/28/2024 3:11:16 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacment
Tracking Number
0004489
Total Compensation
$948,290.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 10/27/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 10/7/2024 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
833
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Section 00 72 00 GENERAL CONDITIONS <br /> <br />City of Everett 00 72 00-17 June 2024 <br />WFP Air Scour Blower Building Replacement Issued for Bid <br />UP3813 <br />Contract Time starts upon the later of the issuance of the Notice to Proceed or a date specified <br />in the Notice to Proceed. The Contractor shall promptly start the Work as soon as possible after <br />the date of the Notice to Proceed and shall prosecute the Work so that the various portions of <br />the Project shall be completed in accordance with the Contract Time period. Contractor shall <br />perform its work at such times and in such ways that the Work is not damaged by weather such <br />as wind, rain, or snow. Contractor shall correct or repair at its sole expense any Work damaged <br />by weather, irrespective of whether such damage is covered by insurance. No portions of the <br />Work where acceptable quality will be affected shall be constructed while unfavorable conditions <br />exist. By bidding on the Project and executing a Contract to perform the Work, Contractor <br />agrees the contractually required completion dates are feasible, reasonable, and achievable for <br />the Contract Sum. Contractor represents that it has considered all factors relevant to its price <br />and achieving the Completion Dates, including, but not limited to, weather, Site access, labor <br />conditions and the availability of materials, supplies and Equipment. Compliance with ARTICLE <br />10. NOTICE TO OWNER, ARTICLE 12. CONTRACT CLAIMS, and 5.2.2. Construction <br />Schedule are conditions precedent to a request for, consideration of, and grant of, any <br />extension of Contract Time. Failure to request a time extension in the manner and in the time <br />required by this section, and the Specifications referred to herein, constitutes a waiver by the <br />Contractor of any and all entitlement to an extension of time and any adjustment of Contract <br />Sum arising out, or related to, such Delay. <br />5.2.2. Construction Schedule <br />5.2.2.1 General <br />Contractor shall submit, update and maintain schedules as required by the Contract <br />Documents. <br />The Contractor shall provide sufficient material, equipment, and labor to meet the interim <br />milestones, Substantial Completion, Physical Completion and Completion Dates provided by the <br />Contract Documents. The Owner allocates its resources to a Contract based on the total time <br />allowed in the Contract. The Contractor may submit a schedule indicating Completion Date <br />earlier than the end of Contract Time, but Owner cannot guarantee its resources will be <br />available to meet such schedule. Owner shall not pay or be liable for any additional <br />compensation if the Contractor is not able to meet a schedule that indicates a Completion Date <br />earlier than the end of Contract Time. <br />Failure to schedule Owner furnished or installed materials and Equipment for installation on or <br />after its planned arrival pursuant to the Owner’s contract with the supplier or failure to Notify the <br />Owner of tasks dependent upon the fact or date of arrival of such Owner furnished materials <br />and Equipment, constitute a waiver by Contractor of any Contract Claim arising out of or related <br />to the timeliness of the furnishing or installation of such material and Equipment. All schedules <br />must allow for timely incorporation of any other's work under separate contract with Owner and <br />for timely incorporation of work provided and installed by Owner. Unless otherwise expressly <br />authorized in writing by the Owner’s Representative, the Contractor must integrate the <br />schedules with the Schedule of Values and unit price items so that each construction activity is <br />represented by a dollar value. <br />Float in a Progress Schedule belongs to the Owner. <br />Subcontractors shall review all schedules prior to submission to the Owner and Owner’s <br />Representative. At the Owner’s option and sole discretion, Owner may require Contractor to <br />obtain written acceptance of each schedule by Subcontractors as practical and feasible, as the <br />schedule relates to Subcontractors’ work. <br />Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly short <br />duration. Contractor shall use its best efforts in good faith to set reasonable durations for all
The URL can be used to link to this page
Your browser does not support the video tag.