Laserfiche WebLink
PHOTOVOLTAIC ROOF MOUNT SYSTEM 0 <br /> 18 MODULES-ROOF MOUNTED - 7.380 kW DC, 6.912 kW AC, 2510 LOMBARD AVE, EVERETT, WA 98201 infinitysolar <br /> INFINITY HOME SOLUTIONS <br /> 6405 E MILL PLAIN <br /> PHOTOVOLTAIC SYSTEM SPECIFICATIONS: SITE DETAIL: SHEET INDEX: DS 07: WIRING SPECIFICATION VANCOUVER WA9 661 <br /> UTILITY: SNOHOMISH COUNTY PV 0.0: GENERAL NOTES AND PROJECT DATA DS 08: MOUNTING-DATA SHEET PHONE:1-800-818-0598 <br /> SYSTEM SIZE: 7.380 kW DC <br /> 6.912 kW AC MSP: EXISTING 200A MSP WITH 2O0A MAIN BREAKER PV 1.0: PLOT PLAN DS 09: RACKING-DATA SHEET INFINITY SOLAR.COM <br /> MODULE TYPE&AMOUNT: (18)ZNSHINESOLAR ZXM7-SH108-410M ROOF MATERIAL: COMPOSITE SHINGLE PV 1.1: SITE PLAN DS 10: RACKING-GROUNDING REVISIONS <br /> MODULE DIMENSIONS: (L/W/H)67.87"/44.64"/1.8" ASCE 7-10 WINDSPEEDS: (3 SEC GUST IN MPH) PV 1.2: ROOF SECTION DS 11: RACKING-CERTIFICATION <br /> Description Date Rev <br /> INVERTER: (09)AP SYSTEMS DS3-L RISK CATEGORY II: 110 MPH IM 1.0: INVERTER MAP Initial Design 4/24/24 00 <br /> INTERCONNECTION METHOD: LOAD BREAKER S 1.1: MOUNT DETAILS <br /> AHJ: CITY OF EVERETT E 1.1: 3-LINE DIAGRAM <br /> E 1.2: NOTES <br /> RACKING: GRASOL RACKING SYSTEM FOR COMP ROOF E 1.3: WARNING LABELS _ <br /> ARRAY AREA: 21.04 SQFT x 18=378.7 SQFT DS 01: PV MODULE SPECIFICATION SHEET Signature with Seal <br /> DS 02: MICROINVERTER SPECIFICATION SHEET <br /> DS 03: COMBINER PANEL CERTIFICATION <br /> DS 04: AC DISCONNECT UL CERTIFICATION <br /> DS 05: AC DISCONNECT UL CERTIFICATION <br /> DS 06: JUNCTION BOX UL CERTIFICATION <br /> PHOTOVOLTAIC NOTES: <br /> 1.AN INVERTER OR AN AC MODULE IN AN INTERACTIVE PHOTOVOLTAIC SYSTEM SHALL AUTOMATIC ALL WITH THE"SMACNA"-GUIDLINES FOR SEISMIC RESTRAINS OF MECHANICAL SYSTEMS AND PLUMING PIPING <br /> DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK SYSTEMS. <br /> UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL 22.ALL OF THE LISTED SYSTEMS REQUIRED THAT THE SEISMIC LATERAL FORCE F INCLUDING Project Name& <br /> PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED. 690361) CONSIDERATION OF a A P AND rAP BE DETERMINED AT EACH LEVEL OF THE BUILDING SO THAT BRACE zs,o�omhard A°�: Address <br /> (NECl Everett,WA 9820'1 <br /> 2.ALL EXTERIOR ELECTRICAL METALLIC TUBING(EMT)CONDUIT FITTING SHALL BE RAIN TIGHT SPACING CAN BE CALCULATED.THE DISTRICT STRUCTURAL ENGINEER CAN APPROVE THE SEISMIC united states <br /> THREAD-LESS COMPRESSION TYPE. LATERAL FORCE DETERMINATION. <br /> 3.MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED 23.A COPY OF THE CHOSEN BRACING SYSTEM(S)INSTALLATION GUIDE/MANUAL SHALL BE ON THE JOB LU <br /> 4.NAMEPLATES SHALL BE PROVIDED FOR ALL CIRCUITS IN THE SERVICE DISTRIBUTION AND POWER SITE PRIOR TO STARTING THE INSTALLING OF HANGERS AND/OR BRACES. U <br /> DISTRIBUTION SWITCH BOARDS,PANEL BOARDS,DISCONNECTING SWITCHES,TERMINAL CABINETS, 24.WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN PINS IN EXISTING Z <br /> ETC. ALL NAMEPLATES SHALL BE PERMANENTLY ATTACHED AND BE OF SUFFICIENT CAPACITY TO NON-PRESTRESSED REINFORCED CONCRETE,USE CARE AND CAUTION TO AVOID CUTTING OR , LU <br /> 0 LU o <br /> WITHSTAND THE WEATHER. DAMAGING THE REINFORCED BARS.WHEN INSTALLING THEM INTO EXISTING PRE-STRESSED CONCRETE <br /> 5.JUNCTION BOX/COMBINER BOX HAVE TO USE COMPRESSION TYPE STRAIN RELIEF POSITIONED FOR TENDONS BY USING A NON-DESTRUCTIVE METHOD PRIOR TO INSTALLATION.EXERCISE EXTREME CARE ' W 0 .0Q Q <br /> APPROPRIATE WATER RUN OFF. AND CAUTION TO AVOID CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION.MAINTAIN A Q z Z <br /> 6.CONDUIT RUNS SHALL BE PROVIDED WITH SUFFICIENT WEATHERPROOF PULL BOXES OF JUNCTION MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR. } Q <br /> BOX/COMBINER BOXES PER APPROPRIATE NEC REQUIREMENTS. 25.THE WORKING CLEARANCES AROUND THE EXISTING ELECTRICAL EQUIPMENT AS WELL AS THE NEW ` - J C z J <br /> 7.SEE PROVIDED CUT SHEETS FOR ADDITIONAL EQUIPMENT SPECIFICATIONS ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH NEC 110.26. OO O Q <br /> 8.WIRING MATERIALS SHALL BE SUITABLE FOR THE SUN EXPOSURE AND WET LOCATIONS.FIELD 26.CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT.(NEC 300.6 01,310.8 D) 2 SATELLITE VIEW z Jo w M w <br /> APPLIED PROTECTIVE COATINGS ARE NOT ACCEPTABLE. 27.GROUNDING BUSHINGS ARE REQUIRED AROUND PRE-PUNCHED CONCENTRIC KNOCKOUTS ON THE <br /> 9.JUNCTION,PULL AND OUTLET BOXES LOCATED BEHIND MODULES SHALL BE SO INSTALLED THAT THE DC SIDE OF THE SYSTEM.(NEC 250.97) Pv o.o SCALE:NTS � N w <br /> WIRING CONTAINED IN THEM CAN BE RENDERED ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF 28.THE GROUNDING ELECTRODE CONDUCTOR MUST BE PROTECTED FROM PHYSICAL DAMAGE IF J <br /> MODULE(S)SECURED BY REMOVABLE FASTENERS AND CONNECTED BY A FLEXIBLE WIRING SYSTEM.(NEC 690.34) SMALLER THAN#6 COPPER WIRE.(NEC 250.64 B) O <br /> 10.IN AN UNDERGROUND PHOTOVOLTAIC SYSTEM,THE POWER SOURCE SHALL BE LABELED WITH THE 29.GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS,EXCEPT FOR SPLICES OR JOINTS AT U <br /> ---16th yt <br /> FOLLOWING WARNING AT EACH JUNCTION BOX,COMBINER BOX,DISCONNECT AND DEVICE WHERE THE BUSBARS WITHIN LISTED EQUIPMENT.(NEC 250.64 C) Q""_t Port Gartlner- <br /> s <br /> e"eren_ 8 <br /> UNGROUNDED CIRCUITS MAY BE EXPOSED DURING SERVICE:"WARNING-ELECTRIC SHOCK HAZARD. 30.RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END.(CEC 250.64(E) Qsatewa, # <br /> THE CURRENT CIRCUIT CONDUCTORS OF THIS PHOTOVOLTAIC POWER SYSTEM ARE UNGROUNDED BUT 31.WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, <br /> N-1 B-ch _ 19+h S, <br /> MAY BE ENERGIZED WITH THE RESPECT TO GROUND DUE TO LEAKAGE PATHS AND/OR GROUND(NECE 690.35(F)) A SIGN WILL BE PROVIDED WARNING OF THE HAZARD PER NEC 690.17.34.EACH UNGROUNDED (Q Health Clinic t k Sheet Name <br /> 11.ALL PHOTOVOLTAIC MODULES AND ASSOCIATED EQUIPMENT AND WIRING MATERIAL SHALL BE PROTECTED CONDUCTOR OF THE MULT-IWIRE BRANCH CIRCUIT WILL BE IDENTIFIED PER PHASE AND SYSTEM PER EOPfen W mi e <br /> FROM ANY PHYSICAL DAMAGE. NEC210.5. �' GENERAL NOTES <br /> 12.ALL ELECTRICAL DEVICES AND UTILIZATION EQUIPMENT SHALL BE LISTED BY AN APPROVED TESTING AGENCY. 32.CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH NEC250.97&250.92(B)&LAMC 93.250.97. ~ "t9 AND PROJECT <br /> 13.OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED. 33.DC CONDUCTORS EITHER DO NOT ENTER THE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR a ren <br /> -� DATA <br /> 14.ALL SPECIFIED WIRING IS BASED ON THE USE OF COPPER ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER NEC 690.31(E),LAMC 93.690.31(E) BAYSIM <br /> 15.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS AND SHALL COORDINATE ALL INSPECTION, 34.ALL METALLIC FRAME RAILS AND OTHER CURRENT CARRYING METALLIC COMPONENTS(CONDUIT, Q Bs1oe Sheet Size <br /> COMMISSIONING AND ACCEPTANCE WITH THE CLIENT,UTILITY CO.AND CITY INSPECTORS AS NEEDED JUNCTION&PULL BOXES,RACEWAY,ETC)SHALL BE SOLIDLY GROUNDED PER THE MANUFACTURER'S s 251eren,WA 9ezot,0 Lombard Ave, <br /> E° ANSI B <br /> 16.DRAWINGS ARE DIAGRAMMATIC ONLY,ROUTING OF RACEWAYS SHALL BE AT THE OPTION OF THE INSTALLATION INSTRUCTIONS LAMC 93.690.110.3&93.110.3(6). j <br /> United States <br /> CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 35.SCREWS,NUTS,BOLTS&WASHERS THAT ATTACH EQUIPMENT GROUNDING LUGS SHALL BE The s s"r'� 11" X 17" <br /> 17.IF DISTANCES OF CABLE RUNS ARE DIFFERENT THAN SHOWN,THE CONTRACTOR SHALL NOTIFY STAINLESS STEEL LAMC 93.110.3(B). R tau a <br /> ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE.FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS 36.NO PIPING,DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE s Ht t vE I; �� AYe EverettQ se t 5 e-n Sheet Number <br /> APPROPRIATE. LOCATED WITHIN THE DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT. " oaz i�°ton <br /> Ave Delia Hotelx <br /> 18.WHENEVER A DISCREPANCY IN QUANTITY OF EQUIPMENT,ARISES ON THE DRAWINGS OR 37.ALL FIELD INSTALLED JUNCTION,PULL AND OUTLET BOXED LOCATED BEHIND MODULES OR PANELS Q Mus-'r QbY N,a,.,ou ��/ O O <br /> Starbucks Seattle... <br /> SPECIFICATIONS,THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL SHALL BE ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF A MODULE(S)OR PANEL(S)SECURED BY o V <br /> Q Laura Palmers House <br /> MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN REMOVABLE FASTENERS. 'a <br /> THE SPECIFICATIONS TO ENDURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM 38.REMOVAL OF A DWP-INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE <br /> REQUIRED BY THE ARCHITECT/ENGINEER. BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAICHi Qse9„° /l <br /> h Schnol <br /> 19.ALL BROCHURES,OPERATION MANUALS,CATALOGS,SHOP DRAWINGS,ETC.SHALL BE HANDED SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTOR. E1r Qstaa,"m Flew <br /> OVER TO THE OWNER'S REPRESENTATIVE AT THE COMPLETION OR WORK. 39.THE ROOF MOUNTED PHOTOVOLTAIC MODULES,PANELS,OR SOLAR VOLTAIC ROLL ROOFING anus - T eninr�1 <br /> 20.ALL WIRING CONCEALED IN WALL AND CEILING SPACES SHALL BE IN METAL CONDUIT. MATERIAL SHALL HAVE THE SAME OR BETTER LISTED FIRE-RESISTANCE RATING THAN THE BUILDING SO-1 <br /> 21.THE SEISMIC BRACING AND ANCHORAGE OF ELECTRICAL CONDUITS SHALL BE IN ACCORDANCE ROOF-COVERING MATERIAL. <br /> 1 GENERAL NOTES AND PROJECT DATA 40.ALL ROOF MOUNTED CONDUIT WILL BE A MINIMUM 1/2"OFF THE ROOF SURFACE. VICINITY MAP <br /> Pv <br /> 00 <br /> Pv 00 <br /> SCALE:NTS <br />