My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/09/11 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/09/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 9:56:21 AM
Creation date
9/12/2024 9:51:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Dan Enrico <br />7/26/24 <br />Page 2 of 3 <br /> <br /> <br /> <br /> <br /> <br /> <br />Bellevue, WA Carlsbad, CA Spokane, WA <br />in completing and stamping record drawings, perform the Arc Flash study, and provide Arc Flash <br />labels. <br /> <br />Scope of Services <br />The services are as follows: <br />1. Design <br />The design will include: <br />a. Review current design. <br />b. Update current design, submitting markups to City of Everett for CAD updates <br />c. PE sign and stamp electrical package for Bid/Construction <br />d. Remote meetings <br />2. Construction Assistance <br />This will include: <br />a. Submittal Reviews <br />b. RFIs <br />c. Arc flash model and stickers (SKM platform) <br />d. Record drawing markups to City of Everett <br />3. Commissioning <br />This will include: <br />a. Commissioning planning assistance <br />b. Device IO Checkout <br />c. Onsite startup assistance <br />Assumptions <br />1. City of Everett to complete CAD work. <br />2. City of Everett supplying PLC and VFD control panels. <br />3. PLC and VFD control panel design and wiring details are not required, as they are already <br />built. <br />4. 1 Meeting onsite for bid phase services, 1 meeting onsite during construction, and 3-4 days <br />onsite for startup. <br />5. ~6 remote/virtual meetings during construction. <br />Exclusions <br />1. Selective Breaker Coordination <br />2. Hardware <br />3. Software <br />4. Washington State Sales Tax
The URL can be used to link to this page
Your browser does not support the video tag.