Laserfiche WebLink
Mr. Dan Enrico <br />7/26/24 <br />Page 3 of 3 <br /> <br /> <br /> <br /> <br /> <br /> <br />Bellevue, WA  Carlsbad, CA  Spokane, WA <br />Compensation <br />Casne Engineering proposes to perform the Scope of Services outlined above on a Time and <br />Materials basis in accordance with the attached Fee Estimate worksheets. The cost breakdown <br />is as follows: <br />Design $ 7,502 <br />Construction Assistance $ 23,940 <br />TOTAL $ 31,442 <br /> <br /> <br />As requested, I have broken this cost down by tasks discussed in our meeting on 7/25: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Thank you again for this opportunity. If you have any questions or additional information is <br />required, please do not hesitate to call. <br /> <br />Sincerely, <br />CASNE ENGINEERING, INC. <br /> <br /> <br /> <br />Travis Kinder <br />Project Manager <br /> <br /> <br />Attachments <br /> <br />cc: Paul Wilhelm, City of Everett <br /> Curtis Clute, Casne <br />File <br />Design Review:$3,336 <br />Design Completion:$4,166 <br />Bid Phase:$1,600 <br />Construction Support:$9,440 <br />Commissioning Support:$9,380 <br />Arc Flash:$3,520 <br />Total $31,442