IMCO General Construction 9/5/2024 Change Order 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
IMCO General Construction 9/5/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 11:18:27 AM
Creation date
9/13/2024 11:15:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
9/5/2024
Council Approval Date
9/4/2024
End Date
2/22/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003541
Total Compensation
$3,477,249.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 12/13/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 63 63 - 4 <br />Water Filter Plant Portal 4 Improvements WO# 3755 <br /> <br /> <br />00 63 63 - 4 CHANGE ORDER - AGREED <br /> <br /> <br /> <br />Change Order No.____2____________________ <br />Change Order Effective Date:__8/16/24_________ <br /> <br />Exhibit A—Description of Changed Work <br /> <br />Change Order #2 removes five (5) items and adds four (4) new items to the contract as follows: <br />Removed Items <br />Remove Bid Item #6 – Installation of proposed pipe sections and 36-inch diameter isolation valve <br />on transmission line 2. Remove Bid Item #6 in the amount of $718,000.00 resulting in a <br />$779,030.00 contract price decrease including sales tax. <br />Remove Bid Item #7 – Installation of proposed pipe sections and 36-inch diameter isolation valve <br />on transmission line 3. Remove Bid Item #7 in the amount of $495,000.00 resulting in a <br />$537,075.00 contract price decrease including sales tax. <br />Remove Bid Item #8 – Installation of proposed pipe sections and 36-inch diameter isolation valve <br />on transmission line 4. Remove Bid Item #8 in the amount of $493,000.00 resulting in a <br />$534,905.00 contract price decrease including sales tax. <br />Remove Bid Item #10 – Removal and relocation of Eco-block wall, foundation, and subdrain. <br />Remove Bid Item #10 in the amount of $84,000.00 resulting in a $91,140.00 contract price <br />decrease including sales tax. <br />Remove Bid Item #12 – Trench safety system. Remove Bid Item #12 in the amount of <br />$238,000.00 resulting in a $285,230.00 contract price decrease including sales tax. <br />New Items <br />New Item #101 – Work Change Directives 1-19. Create new item #101 entitled “Work Change <br />Directives 1-19” by adding a lump sum line item in the amount of $707,046.34 resulting in a <br />$767,145.28 contract price increase including sales tax. <br />New Item #102 – Excavator and Crane Mobilization/Demobilization Credit. Create new item #102 <br />entitled “Excavator and Crane Mobilization/Demobilization Credit” by adding a lump sum line item <br />in the amount of $-3,755.78 resulting in a $4,075.02 contract price decrease including sales tax. <br />New Item #103 – Medium Voltage Cable Credit. Create new item #103 entitled “Medium Voltage <br />Cable Credit” by adding a lump sum line item in the amount of $-28,720.76 resulting in a <br />$31,162.02 contract price decrease including sales tax. <br />New Item #104 – Equitable Adjustment. Create new item #104 entitled “Equitable Adjustment” by <br />adding a lump sum line item in the amount of $248,966.57 resulting in a $270,128.73 contract <br />price increase including sales tax. <br />Justification <br />