IMCO General Construction 9/5/2024 Change Order 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
IMCO General Construction 9/5/2024 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 11:18:27 AM
Creation date
9/13/2024 11:15:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
9/5/2024
Council Approval Date
9/4/2024
End Date
2/22/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003541
Total Compensation
$3,477,249.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 12/13/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 63 63 - 5 <br />Water Filter Plant Portal 4 Improvements WO# 3755 <br /> <br /> <br />00 63 63 - 5 CHANGE ORDER - AGREED <br /> <br /> <br /> <br />Remove Bid Item #6 – Installation of proposed pipe sections and 36-inch diameter isolation valve <br />on transmission line 2. The proposed installation of pipe sections and a 36-inch diameter isolation <br />valve on transmission line 2 was removed from the project’s scope of work by the City due to the <br />difficulties and high costs associated with keeping the transmission line in operation while the <br />proposed work was completed. Isolation of transmission line 2 was accomplished through the <br />addition of stop logs within Portal 4 via WCD 10. <br />Remove Bid Item #7 – Installation of proposed pipe sections and 36-inch diameter isolation valve <br />on transmission line 3. The proposed installation of pipe sections and a 36-inch diameter isolation <br />valve on transmission line 3 was removed from the project’s scope of work by the City due to the <br />difficulties and high costs associated with keeping the transmission line in operation while the <br />proposed work was completed. Isolation of transmission line 3 was accomplished through the <br />addition of stop logs within Portal 4 via WCD 10. <br />Remove Bid Item #8 – Installation of proposed pipe sections and 36-inch diameter isolation valve <br />on transmission line 4. The proposed installation of pipe sections and a 36-inch diameter isolation <br />valve on transmission line 4 was removed from the project’s scope of work by the City due to the <br />difficulties and high costs associated with keeping the transmission line in operation while the <br />proposed work was completed. Isolation of transmission line 4 was accomplished through the <br />addition of stop logs within Portal 4 via WCD 10. <br />Remove Bid Item #10 – Removal and relocation of Eco-block wall, foundation, and subdrain. The <br />proposed removal and relocation of the existing Eco-block wall, foundation, and subdrain was <br />removed from the project’s scope of work by the City because the work was no longer necessary <br />when Bid Items 6, 7, and 8 were removed. <br />Remove Bid Item #12 – Trench safety system. The proposed trench safety system was removed <br />from the project’s scope for work by the City because the work was no longer necessary when <br />Bid Items 6, 7, and 8 were removed. <br />New Item #101 – Work Change Directives 1-19. Work change directives 1-19 executed to date <br />had a combined cost of $707,046.34 which was paid via unspent project funds. New Item #101 <br />is being added to the project scope to account for the costs associated with work change <br />directives 1-19 and enable the unbuilt work items to be removed from the project scope. Further <br />justification for work change directives 1-19 is attached. <br />New Item #102 – Excavator and Crane Mobilization/Demobilization Credit. New Item #102 is <br />being added to the project scope to account for a cost credit received by the City resulting from <br />the removal of excavator and crane mobilization/demobilization scope of work. Further <br />justification is attached. <br />New Item #103 – Medium Voltage Cable Credit. New Item #103 is being added to the project <br />scope to account for a cost credit received by the City resulting from a change in the type of <br />medium voltage cable installed during the project. Further justification is attached. <br />New Item #104 – Equitable Adjustment. New Item #104 is being added to the project scope to <br />account for actual costs incurred by the project contractor during mobilization/demobilization and <br />during project delays. The delays are outside of the City of Everett’s or the project contractor’s <br />control but have now been addressed. The project contractor provided written notice as per <br />contractual requirements when seeking additional funds to pay for overhead and management <br />costs associated with the project delay. The mobilization/demobilization costs included in the